Laserfiche WebLink
SECTION 3 - SUBDIVISION APPLICATIONS <br />At the time of filing for preliminary plat approval, the developer shall <br />ovide a site evaluation report confirming that each building site <br />4 has sufficient suitable soil for on -site sewage <br />treatment. Submittals required: <br />R� <br />1. Plot plan which shall be a copy of the preliminary plat drawing <br />showing all existing structures, wells, and drainfield systems <br />and all proposed `•,i'Iding sites, well locations, primary and alternate <br />drainfield locations. <br />2. Site evaluation report which shall tabulate date from at least <br />three (3) soil borings and six (6) percolation tests on each proposed d <br />building site of less than 5 acres. i <br />3. Copy of the current compliance inspection report for each existing <br />�n-site system within Lhe subdivision boundaries. <br />4. Where the site evaluation shows slopes in excess of 12%, percolation <br />rates slower than 60 minutes per inch, ground wat.--- table less than <br />5 feet deep or soil classification requiring -inovativo system <br />design, the site evaluation report shall also indicate -pecific <br />system design specifications i- normally required for construction <br />permit applications. <br />r7r ] (N 4 - INNOVATIVE SYST IS <br />plications for innovative system installation variances shall include all the data <br />quired for standard system applications, plus any additional data necessary to <br />tablish the acceptability of the proposal. Such data would normally include case <br />stories oZ similar installations, manufacturer's literature, independent test <br />cults and engineering reports. <br />161 <br />