Laserfiche WebLink
Reviewed for Code Compliance <br />Nicole Post <br />RPS24-000102 <br />9-10-24 <br />Approved plans must be on site for <br />the duration of the project. Plans <br />must be available to inspector. <br />Please call 952-249-6000 to schedule <br />all inspections. Have permit number <br />and address when calling. <br />Separate Permits Required: <br />Plumbing <br />Mechanical <br />Electrical <br />Septic <br />Pool <br />Retaining walls <br />Please plan accordingly. The City will not issue a Temporary Certificate of Occupancy (Temp CO) for new <br />homes during the growing season from May 1st to November 1st. Issuance of a Certificate of Occupancy <br />requires all permits associated with the project to be finaled and an as-built survey approved by the City. If <br />vegetation is not fully established at the time of CO issuance, the erosion control escrow will continue to be held. <br />Keep all heavy equipment off the <br />proposed treatment areas before <br />and after construction. The <br />treatment area must be fenced off <br />before construction begins. The <br />system will need to be relocated if <br />failure to protect the areas <br />proposed for the on-Site Sewage <br />Treatment System occurs.