My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-09-23 On Site Sewage Treatment Inspection Report
Orono
>
Property Files
>
Street Address
>
D
>
Dakota Avenue
>
884 Dakota Avenue - 26-118-23-33-0020
>
Septic
>
1987-09-23 On Site Sewage Treatment Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:44:25 PM
Creation date
7/31/2025 2:42:30 PM
Metadata
Fields
Template:
x Address Old
House Number
884
Street Name
Dakota
Street Type
Avenue
Address
884 Dakota Avenue
PIN
2611823330020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On the• .%'nrtb Sborc of <br />Lake ;Vl iptnetonka <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT POST uf-i-ft t BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER _�' 4 1'�Ar'r�[? rl ADDRESS � C/ 6 �Iiyt� <br />PERMIT NO.'S. LAOU71--- DATES---L=y- 77 (,,,' CONTRACTORS <br />City Ordinance Nc. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />(This is A an existing system ❑ new construction) <br />1�1 1 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears :o be operating <br />ICJ properly. <br />2 Does not meet all current City standards for new construction (1978 Code) but in most respects appear-, to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />Q 3 Does not meet current City standards inmany respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />4 System may or may not meet current City standards for design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, of as a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainfield replacement is necessary, sod testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION ( m Checked items may require your action) <br />Tank inspection indicates. <br />9 Pumpout not needed at this time. <br />❑ Solids accumulation in tanks indicates they should be pump- <br />ed out this year to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />❑ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection risers missing —tanks could not be inspected. <br />Inspection risers 14" dia. pipe) must be installed in each tank <br />at next pumpout. if tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />SITE CHARACTERISTICS <br />LI Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now. <br />Drainfield inspection indicates. <br />Ed Drainfield is dry, no surfacing evident. <br />❑ Some evidence cf surfacing, not critical yet. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions to diainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Drainfield extent and condition unknown. <br />Limiting Site Factors <br />Potential for System Failure <br />Site Capabilities for <br />❑ Slope <br />(depends on soil types, water <br />Future Expansion <br />❑ Soil <br />table, and system condition) <br />Adequate <br />❑ High water table <br />IR Low <br />Fair <br />❑ Poor <br />❑ Lot size <br />® Medium <br />Cl High <br />❑ Inadequate <br />❑ Lake, wetiond, or stream <br />❑ Drainage <br />❑ System is causing visible <br />surface discharge. <br />COMMENTS <br />Date of Inspection Septic n Inspector <br />Note. In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information. <br />This report roust be kept on the premises with system location and pumping records. <br />WHITE COPY I Inspector's File GOLD COPY / Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.