Laserfiche WebLink
Ono G Bore PE <br />P <br />Bonestroo wxpnC Arm PE <br />&aWao A Lertroelq PE <br />Rosene Rlcnaro E Twnn PE <br />,or" C Gson PE <br />Ande ^tik & Gcnn R Cu,� PE <br />rr4ye ihos E NoL PE <br />Rooert G 16— PE <br />' ' 1 <br />1 <br />Associates MJIV. L SC-94 PE <br />Engineers & ArrAltects <br />August 10, 1989 <br />City of Orono <br />1335 Brown Road So. <br />Orono, MN 55323 <br />Re: Water Well Test Drilling <br />Orono, MN <br />File No. 13948 <br />Dear Mayor and Council Members: <br />aeu, A Croon. PE — <br />M4naee C Lyncn PE <br />Pn&o 1 CASW" PE <br />R,cnaro W Four. PE <br />James R MaLvd. PE <br />mma O SAo&L PE <br />Dona] C. BurgYOL PE <br />sernem P AnoenoL PE <br />Tnomas R .Ar4er✓S A rr <br />Jerry A Bow". PE <br />X&An A aacrana +. PE <br />Cry F P),Uru ff PE <br />Ma+a A runwn. PE <br />Ma,a R kJ-. PE <br />Cn.u,es A Ereu:.n <br />Te,a K Fw a PE <br />Rooen C Ruuea. AJA <br />Leo M Pa. Say <br />AA,ra" t 4auun0n11. PE <br />TnonaL E AnguL PE <br />1,wtan M O.Scn <br />Rooen R Pfenene. PE <br />"a -No A Srvoo PE <br />S..un M EOHus C PA <br />0av4 O LDUWU. PE <br />Danes 1 Eogenon PE <br />Tnorews W Pe,eesorL PE. <br />Mara A kp PE <br />Enclosed are the contract documents far the test drilling to find a suitable <br />aquifer for a large capacity municipal wf:ll and the construction of a small <br />well for temporary use. The sequence of drilling and construction set forth <br />in the specifications is as follows. <br />I. Test Dri'ling <br />A. Dril_ a test role at the primary site (Otten property) to determine if <br />sufficient Prairie -du -Chien is available for a large capacity well. <br />1. If there is sufficient aquifer available, a water analysis will <br />be taken and the test drilling completed. <br />2. If aquifer material is not available, a test hole wil.l be drilled <br />on the secondary site (Rebers property). It is intended to drill <br />the secondary site prior to extending the test hole to the Mt. <br />Simon because a) the Mt. Simon test hole is approximately $20,000 <br />mo,e than a Prairie -du -Chien test hole and b) the secondary site <br />is closer to Long Lake's wells where the Prairie -du -Chien is <br />present. <br />B. If Prairie -du -Chien is not present at the secondary site a Mt. <br />Simon test hole will be drilled and a water sample taken for <br />analysis including radium. <br />Page 2 <br />2335 West Highway 36 0 St. Paul, Minnesota 55113 • 612-636-4600 <br />