My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
09-25-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
7/29/2025 11:54:14 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/25/1989
Retention Effective Date
7/29/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r1 <br />�1 <br />Bones t roo <br />Ono G Boom= PE <br />JoSeph C ArWerkkvPE <br />riabrRosene :Khafa A unet P PE <br />Rc naro E Twner PE <br />Anderlik & <br />Glf—Iffvs R Coc000n PE <br />Glenn t PE <br />i Associates <br />Thomas E YO,ts PE <br />Pooert G knuncm PE <br />1 <br />J <br />tiranm L S.mma PE <br />Engineers 51 Architects <br />August 16, 1989 <br />City of Orono <br />Box 66 <br />Crystal Bay, MN 55323 <br />Attn: Jeanne Mabusth <br />Re: 139-1446 Jack Yost Property <br />Storm Damage Repair <br />Dear Jeanne: <br />KtAn A Goroon PE <br />Mcrnad C _yKn PE <br />Pndo J Caswea PE <br />RKhaid W Foster PE <br />James R '.Utand PE <br />Mark D Wacm PE <br />Cona10 C 8u19arot. PE <br />renrrtn P Allmon PE <br />Thomas R AnOerson A I A <br />Jerry A Bouroon PE <br />h A Bacnma- °F <br />Gary F Pyanoer PE <br />MatkA Hanson PE <br />red K F�,7 PE <br />("'Ma�SiRy!E � 4 <br />nn'�s �--son <br />I i FOttCS �fys'f"'KI AAA I LIO M-Pd+t yl <br />Mcnael r Rautmann PE I ? <br />-H�4-?s Olson <br />Rooeq R Pft e-e PE <br />II <br />H04\aro A �rOrO PE <br />Susan .M I r� C PA <br />Daw O Loskota PE <br />TNxnas W Pete -.on PF <br />Dann 14 on PE <br />• Matk A gC 2 <br />I I <br />, 11989 <br />'-1 -----V <br />J <br />We have reviewed the lake shore resrn:dtion work proposed on the Jack Yost <br />property at 1515 Green Trees Road along Tanager Lake. <br />The retaining wall should be builir prior to any landscaping work within the <br />wall so that the wall can act as a protective zone from erosion or damage to <br />the exterior banks along the lake. <br />The mateiial banked against the outside of the wall should be a soil of <br />cohesive nature and a stabilizatior. fabric should be incorporated within the <br />backfill to prevent erosion. Silt fence should also be required at the base <br />of fill areas where the slope is steeper than 4 to 1. <br />The elevation of the new wall shall not be allowed to exceed the 956.0 <br />elevation and no more than 6 vertical feet of wall shall be exposed. <br />Planters proposed to be built adjacent to the wall in areas in areas where the <br />wall height exceeds 30" should be sufficient for pedestrian restraint to <br />prevent a fall and so handrail should not be required. However, a more <br />detailed plan layout of the plan-_ers should be submitted for review. <br />The storm water drainage control plan incorporates a trend. drain system that <br />intercepts storm water from the roof leaders and directs it to an existing <br />storm holding and drainage area. The drainage of surface water from behind <br />the retaining wall will reduce the pressure loading against the the proposed <br />retaining wall. <br />Page 1 <br />s: <br />233S West Highway 36 • St. Paul, Minnesota SS113 • 612-636-4600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.