Laserfiche WebLink
COMPARISON OF CONSTRUCTION STRANDARDS <br />Willow Drivo. (Medina Border to Highway 12) <br />- Minor Arterial (Orono Comprehensive Plan) <br />Typical Section <br />Travelled Shoulders Paved With Right -of -Way <br />Portion Each f,de Shoulders Rural Section <br />Willow At Present <br />Width of Highway 12 <br />24' <br />4' <br />32' <br />66' <br />City Standards <br />Minimum 80' <br />Minor Arterial <br />24'* <br />8' <br />40' <br />for Two Lane** <br />Municipal State Aid <br />Standards <br />24' <br />8' <br />40' <br />8C-100 <br />County Proposal <br />24' <br />Be <br />40' <br />80' <br />County Road 116 <br />The proposal <br />will "strit,�" <br />a <br />fog line at the <br />24' Width <br />Willow Drive South <br />of Railroad Tracks 24' 9' '2' 66' <br />(Collector) <br />*Minimum Paved Width (Chapter 11.33) <br />**Orono Comprehensive Plan (Chapter 7--15) <br />