My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
09-11-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
7/28/2025 11:51:08 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/11/1989
Retention Effective Date
7/28/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B) The p.Yoposet' plan satisfies the objectives of. the <br />Transportation Plan of Comprehensive Plan Amendment No. <br />2 as applicant has provided dedication of access for <br />Highway 12 and a road outlot to serve as an east,/west <br />frontage road. <br />C) Municipal sanitary sewer and water has been ordered <br />to serve the property. <br />D) Applicant has provided detention areas on the site <br />and will provide more detailed drainage plans upon <br />approval of the general concept stage and as a <br />requirement of the final development stage of the PUD <br />rezoning. <br />E) The rUD zoning and format of development is <br />preferr-d within the Highway 12 Corridor. <br />F) The exterior of commercial building proposed for <br />Lot 1 of the commercial subdivision shall be of a <br />combination of tan and dark brown concrete Llocks with <br />split -face stone finish with trim of dark ti --jn and <br />green to match annodized aluminum with clear ,.azing <br />used through area where plant materials are maintained. <br />All accessory structures shall be of the same exterior <br />finish and exterior colors. <br />G) Applicant shall enter into a Development Agreement <br />with the City to specify timing of all improvements <br />associated with the development and developer's <br />financial commitments related to those improvements. <br />3. The residential portion of the subdivision application <br />involves a lot line rearrangement of existing residential <br />lots. Each of the newly rearranged lots saLl..'lies the area <br />and lot width standards finding that each lot •ontinue <br />to be used for residential use and future construction <br />without the need of further variances. <br />4. The proposed vacation of Pine Ridge Lane is consistent <br />with the directives of Comprehensive Plan Amendment No. 2 as <br />the applicant has dedicated a road outlot through the <br />commercial portion of the property for an east/west frontage <br />road. <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.