Laserfiche WebLink
^5 Ancferllk & <br />Associates <br />Engl^fKy^i^HM'J <br />i»r.-0 iMmPt <br />W tomim. Pt <br />^'«vt c AMt^ n <br />•ictwMf M <br />itrvtC r>«A M <br />0»wt Con.Pt <br />n«AM« I Noyot ft <br />fcMA 0 lf»*#»rW. PI <br />M»w<l taryM. Pf <br />MK A OOMIA Pf <br />iKtm w taoM Pf <br />OenMf C SMeMl. Pf <br />J*»ry A SniMlDrv Pt <br />U«« A Hirmr Pt <br />Ml PM Pt <br />UttM r omam Pt <br />■eemt pmm. Pf <br />0m«O IMM Pf. <br />nwAN w Win Pt <br />SMMC LyMl PC <br />iimnc UilMLPC <br />MnrMAP An*fW% PI <br />W« A taP»A«n ft. <br />MMf MiPf. <br />WnC IMHI. AIA <br />TAomMl Angui PC <br />MmMAS vWPC <br />Untmax / <br />IU7 18, 1989 <br />City of Orono <br />Box 66 <br />Cryftftl Boj, Wf S5929 <br />H»i Saaitarx Savor Xaprovaaanta <br />Lift Station 10 Baplacaaont <br />Lift Station 43 Baplacaaont <br />Our FUa No. 13949 <br />Daar Kayor and Councils <br />On Friday, Kay 12, 1989 aaaled bide vara receivad for tho abova rafarancad <br />projact. Tha lov bidder vaa Albracht Kxcavcation, Inc. vith a total baaa bid <br />of $181,640.63. A total of aiz (6) bida vara racaivad. All bide hava boon <br />raviavad and coaqratar chackad. A copy of tha tabulation ia ancloaad for your <br />raviav. <br />Tha folloving ia a auamary of tha bida racaivadi <br />Albracht Ezcav., Znc. <br />Northdala Conat. Co. <br />0 6 F Contracting, Znc. <br />Brovn 6 Cria <br />Kanko, Inc. <br />G.L. Contracting, Inc. <br />Part I <br />$126,184.40 <br />143,980.00 <br />169,344.30 <br />181.663.23 <br />178.863.24 <br />188,603.40 <br />Part II <br />$33,436.23 <br />38,416.00 <br />73,393.30 <br />38.136.73 <br />74.406.74 <br />91,200.24 <br />Total <br />$181,640.63 <br />204.396.00 <br />233.638.00 <br />239.800.00 <br />233,271.98 <br />279,803.64 <br />Tha City ia propoaing to finance Part I vith connaction chargaa and ravanua <br />fron aavar rataa. Tha connaction charge vill ba laviad againat future unita <br />to ba connected to tha ayatan. <br />Tha City ia propoaing to finance Part II vith funda racaivad fron MVCC for <br />aliainating a lift atation and ravanua fron aavar rataa. Tha MVCC haa agreed <br />to provide approziawtaly $41,000 to tha City of Orono if tha lift atation ia <br />aliainatad. The City vould hava to provide $14,436.23 plua adniniatrativa <br />coata fron tha aavar operating fund to finance Part II. <br />Page 1. <br />2335 U4wt Highway 3A • St. Paul. Minnesota 55II3 • 612<63A-4600 <br />..-V -V’’