Laserfiche WebLink
ON SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />ORONO <br />On the North Shore of <br />Lake Minnetonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER T)f7^k- Sji faiAYtrygg address <br />PERMIT NO.'S.J2M DATES CONTRACTORS <br />□ l <br />02 <br />□ 3 <br />□ 4 <br />city OrcNrancs No. 210 rMtuirat that aoth on-aita tawaga traatmant tyitam in Orono ba inipectad on a regular basis. The on-site sewage <br />treatment system at the above address has bean inspected and appears to fall into the category checked below. <br />(This is (9 an existing system □ new construction) <br />Moots or exoaeds current City standards in all respects relating to design, consouction, and location. Appears to be operating <br />properis. <br />Does not moot all current City standards for now construction <1978 Code) but in most respects appears to be design^, <br />located, and oonstructad generally In accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is roquirod at this time. <br />Does not meet current City standards In many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />System may or may not meet current City standards for design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuu system repeir/ <br />replacam-^.f procedures. If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must bab.umittad for review. Your conuactor most obtain a permit before work is started. <br />SYSTEM CONDITION ( Ql Chackad items may require your action) <br />Tank impaction indicates: ^rf inspection pipe is located directly over tank baffle. (Does not <br />□ Pumpout not needed at this time. give accurate measurement of solids accumulation.) JUaoks <br />□ Solids accumulation in tanks indicates they should be pump* have not been m <br />ad out this year to help pravant future proMams. <br />□ Solids accumulation in tanks is at a critical lev»l. Tanks <br />should bo pumped out as soon as possible. <br />□ Systam is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />□ Impaction risers missing—tanks could not be inspected. <br />Impaction risers <4" die. pipe) must be imtalled in each tank <br />at next pumpout. If tanks have not boon pumped out within <br />the last thraa years, they should be pumped out now. <br />should be oumoed out now. <br />Drainfield inspection indicates: <br />□ Drainfield is dry, no surfacing evident. <br />4^4- Some evidence of surfacing, not critical veu <br />□ DrMnfMd II Uluiklid and visibly discharging untreated <br />effluent to the surface. This condition may require replace­ <br />ment or additiom to drainfield. Contact th9 City Inspector <br />immediately. Repeirs must be completed within 90 days. <br />□ Drainfield extent and condition unknown. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />□ Hope <br />□ Soil <br />□ High water table <br />□ Lot size <br />□ Lake, wetland, or stream <br />□ Drainage <br />Potentiel for System Failure <br />(depends on soil types, water <br />table, and system condition) <br />□ Low <br />□ Medium <br />Q High <br />System is causing visible <br />Site Capebilities for <br />Future Expansion <br />□ Adequate <br />Fair <br />□ Poor <br />n Inadequate <br />Note: In the event that this inspection report is used to satisfy the requiremenu for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that an existirtg system will continue to function properly, but is merely an opinion of the adequacy <br />of the tys'jm under current conditiom based on the available information. <br />This report must be kept on the premises with sysrem location and pumping records. <br />WHITE COPY / Inspector's File GOLD COPY / Homeowner