My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-09-09 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Cygnet Place
>
250 Cygnet Place - 04-117-23-23-0018
>
Septic
>
1988-09-09 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 2:07:59 PM
Creation date
7/16/2025 2:05:26 PM
Metadata
Fields
Template:
x Address Old
House Number
250
Street Name
Cygnet
Street Type
Place
Address
250 Cygnet Place
PIN
0411723230018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All IniWtaUont mutt comply wHh ■« tppllcrtl. .Itcl^ltnd codot. Including but not llmittd to, tho <br />MotkmolEloctrlctl Cod#: loctl. regional ind/orttatt plumbing codot. t^ 00 Y 1 2 3 4 5 & 20 <br />TYPICAL SUMP (DEWATCRINO) IN8TALLATI0M <br />DIAGRAM A <br />TURN <br />OFF' <br />local electrical requirements. <br />2) ‘Install a proper HiLo EZ Check (combination union and check <br />valve) preferably just above the basin to allow easy removal of <br />tho pump for cleaning or repair. See 3) below. <br />3) “When a HILo EZ Check (check valve and union) is installed <br />with a LoBoy 3. drill a 3/16" hole in tho discharge pipe oven with <br />tho top of tho pump. The hole must be below the basin cover. <br />4) All installations require a proper basin cover to prevent debris <br />from falling Into tho basin and to minimize accidental injury. <br />5) Securely tape or clamp power cord to discharge pipe clear of tho <br />float mechanism. <br />•) Minimum 18" diameter x 24" deep basin. <br />7) Use a full size discharge pipe. <br />S) ‘“Level pump in vertical position. Float mechanism must be <br />clear of sides of basin. <br />9) Install blocks or bricks under pump to provide a settling basin. <br />10) Clean basin free of debris after installation. <br />11) Operate switch by running water into pit. Refer to diagram for <br />"ON" and “OFF levels. <br />‘ Note: Splash (vent) hole leakage adjacent to the discharge pipe Is <br />designed and necessary for proper operation for use with check <br />valve. <br />“Note; It is not necessary to drill a vent hole when installing a <br />LoBoy 1.2,4 or 20 as these units do not require a vent hole. <br />“‘Check specific control installation instruction for other type <br />control usage. <br />in*. <br />DIAGRAM B <br />TO LOW PflESSUnE <br />SYSTEM. MOUND <br />SYSTEM. SAND <br />FILTER. LEACHINO <br />FIELD, OR OTHER <br />ON SITE DISPOSAL <br />i. <br />SEPTIC TANK effluent PIT <br />LO BOY 1, 2, 3, & 4 <br />. JYPICAL EFFLUENT INSTALLATION <br />1) Electrical wiring and protection must be in accordance with <br />National Electrical Code and any other applicable state and <br />local electrical requirements. <br />2) All installations require a proper basin cover to prevent debris <br />from falling into basin, and to minimize accidental injury. <br />3) Wire pump to power through a watertight junction box or <br />watertight splice. NOTE: Watertight enclosure is a must in damp <br />areas. <br />4) Use full-size discharge pipe. <br />5) ‘When required, install a proper HiLo EZ Check (combination <br />union and check valve) preferably just below the basin cover to <br />allow easy removal of the pump for cleaning or repair. See 6) <br />below. <br />6) “When a HiLo EZ Check (check valve and union) is installed <br />with a LoBoy 3. drill a 3/16" dia. vent hole In the discharge pipe <br />even with the top of the pump. The hole must be below the basin <br />cover. <br />7) Securely tape or clamp power cord to discharge pipe clear of tho <br />float mechanism. <br />6) “‘Level pump in vertical position. Float mechanism must b.. <br />clear of sides of basin. <br />9) Install blocks or bricks under pump to provide a settling basin. <br />10) Clean basin free of debris after installation. <br />11/ Operate switch by running water into pit. Refer to diagram for <br />"ON" and "OFF" level. <br />•NOTE: Splash (vent) hole leakage adjacent to the discharge pipe <br />is designed and necessary for proper operation for use with a <br />check valve. <br />“NOTE. It is not necessary to drill a vent hole when installing a <br />LoBoy 1,2. or 4 os these units do not require a vent hole. <br />‘“Check specific control installation instruction for other type <br />control usage.
The URL can be used to link to this page
Your browser does not support the video tag.