My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-14-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
07-14-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
7/11/2025 3:08:58 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
7/14/2025
Retention Effective Date
7/14/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: July 14, 2025 <br />Title: Stormwater Drainage Repairs <br />Presenter: DJ Goman, Public Works Superintendent <br />Section: Consent Agenda <br />Item: 12 <br />Purpose: <br />The purpose of this action item is to accept contractor quotes for the repairs in stormwater management <br />system on Wildhurst Trail. <br />2. Background: <br />The city experienced several rainfall events including heavy downpours in a short amount of time in June. <br />Wildhurst Trail saw a washout during one of those events to the stormwater ravine and swale system, causing <br />riprap and sediment to washed down stream plugging up the system. This is an unbudgeted expenditure. <br />3. Scope: <br />This project includes the removal of trees that are a hazard in the slope of the ravine, repair the washed out <br />area, remove sediment from downstream pipes and Swale and restore the stormwater system to help effectively <br />drain water into the existing stormwater catch basin and culverts and outlets. <br />4. Cost: <br />The City of Orono received 4 quotes listed below for the repairs; two for the tree work and two for the <br />excavation work The low quote for the excavation work is MEB Enterprises and the lowest acceptable quote <br />for the tree work was from Priority Tree. <br />Contractor <br />Total Quote <br />Remarks <br />MEB Enterprise Inc. <br />$ 48,560.00 <br />Precision Utilities <br />$ 56,325.00 <br />Priority Tree <br />$ 6,500.00 <br />CJS Services <br />$ 5,000.00 <br />Unable to perform work in <br />timely manner <br />Funding: <br />This project will be funded through the Stormwater Fund. The project end of year balance of the fund after <br />this unbudgeted expenditure will be $ 590,077. <br />6. Staff Recommendation: <br />I recommend the City Council accept the quote from MEB Enterprises Inc. and Priority Tree for Stormwater <br />drainage restoration . <br />COUNCIL ACTION REQUESTED <br />55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.