Laserfiche WebLink
For comparison purposes, the trip generation potential of a 128,000 SF light industrial building was investigated <br />as this would be the size and type of use that would be likely for this parcel. Table 2 summarizes the trip <br />generation estimates for a light industrial building per ITE's Trip Generation Manual. <br />Table 2 - Trip Generation for Li ht Industrial <br />Land Use <br />ITE Land <br />Use Code <br />Size <br />Trips Generated: <br />AM Peak <br />PM Peak <br />Weekday <br />ADT <br />Enter <br />Exit <br />r <br />Exit <br />General Light Industrial <br />110 <br />128,000 s.f. <br />101 <br />15 <br />tl <br />84 <br />623 <br />Totals <br />101 <br />15 <br />84 <br />623 <br />116 <br />1 102 <br />A general light industrial use for the site is estimated to generate over 100 peak hour trips and 623 daily trips. <br />In summary, the number of vehicle trips anticipated to be generated by the Proposed Project is extremely low, <br />approximately one new vehicle trip every 30 minutes during the peak hour, and impacts to existing traffic <br />operations will be minimal. If the site were to be developed into a light industrial building the trip generation <br />potential increases to over 100 trips for the peak hours and 623 daily trips. <br />Please contact Katie Schmidt at katie(&s2traffic.com with any questions. <br />Figure 2. Site Plan <br />Orono Garage Storage Trip Generation Review Page 12 <br />145 <br />