Laserfiche WebLink
connection charges. These fees will be collected with each building permit. The following fees <br />are proposed to be required using the 2025 fee schedule for$4,370.00 water unit and $6,000.00 <br />per sewer unit. (Total $10,370.00 per unit) <br />1. Building 1:1 SAC Unit= $10,370.00 <br />2. Building 2: 3 SAC Units= $ 31,110.00 <br />3. Building 3: 4 SAC Units= $ 41,480.00 <br />4. Building 4: 4 SAC Units= $ 41,480.00 <br />5. Building 5: 2 SAC Units= $ 20,740.00 <br />In total all 5 buildings will result in 14 SAC units and would require (14 x $10,370.00) <br />145,180.00 in fees for water and sewer area connection fees. Developer agrees that to pay SAC <br />charges at the rate in effect as of the date the building permits are issued. <br />22. [not used] <br />23. PARK DEDICATION FEE.Not applicable. <br />24. LANDSCAPING. All landscaping shall be installed in accordance with the approved <br />landscape and restoration plan prior to release of any security. The construction limits shall be <br />clearly marked with adequate fencing and signage around trees to prevent any construction <br />damage or disturbance of any trees and vegetation outside of the construction area. <br />25. SPECIAL PROVISIONS. The following special provisions shall apply to <br />development of the Land: <br />A. Implementation of and adherence to the findings and conditions listed in <br />Resolution 7579 Granting Preliminary Approval for a CIC Plat, Conditional Use Permit and Site <br />Plan Approval for Garage Condo Development (File No. LA24-000068) dated April 28, 2025 <br />and in Resolution 7586, Granting Final Plat Approval of the Common Interest Community Plat: <br />Orono Garage Condominium" CIC Plat Phase 1: Buildings 1 and 2 (File No. LA 24-000068) <br />dated May 12, 2025. <br />235929v3