Laserfiche WebLink
v..O.NO CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />G~NO. 7586 <br />k8SHO4 <br />NOW, THEREFORE, BE IT RESOLVED, based upon the findings of Resolution <br />No. 7579, the Orono City Council does hereby approve the plat of ORONO GARAGE <br />CONDOMIMIUM CIC Plat for Phase 1: Buildings 1 and 2 (a copy of which is attached as <br />Exhibit A), subject to the following conditions: <br />1) Development within ORONO GARAGE CONDOMIMIUM is subject to the Conclusions, <br />Orders, and Conditions enumerated within Preliminary Plat, Conditional Use Permit and Site <br />Plan approval Resolution No. 7579 dated April 28, 2025. <br />2) Dedication on the plat of the Ingress, Egress, Drainage and Utility Easements as required in <br />Resolution 7579. <br />3) The approvals granted in this Resolution shall become effective only when all conditions of <br />approval requiring actions by the Developer have been satisfied. <br />4) Minnehaha Creek Watershed District(MCWD)-approved permits for the grading, stormwater <br />management facilities, storm water pollution prevention plan (SWPPP), and erosion control <br />shall be submitted as required. <br />5) An updated Alta Commitment for Title Insurance dated April 16, 2025 and certified copies of <br />all recorded easements currently affecting the Property have been submitted. <br />6) The Property is within the MUSA and will be served by the city's sanitary sewer and public <br />water connections. <br />7) Payment of Development Fees Required (2025 fee schedule): Total: $47,384.10. <br />a. Stormwater and Drainage Trunk Fee: $47,384.10. <br />8) Additional fees will be required with the appliable building permits for the site as follows: <br />a. Water and Sewer Connection Permits: Connection permits will be required for each <br />individual unit (85 units proposed) and will follow the applicable fee schedule for the year <br />in which they connect. The individual permits and fees will be due at the time the <br />connections are a installed to serve each unit. The fees will be collected with the building <br />permit for the subject building. <br />b. Met Council Sewer Availability Charge ("SAC"): Due to the size of the buildings and <br />the number/type of proposed connections it is estimated that the development will <br />require 14 SAC units in total according to the 2024 Met Council determination letters. <br />The 2025 SACs have not increased. The SAC will be collected with each building permit. <br />2