My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-04-28 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Cygnet Place
>
20 Cygnet Place - 04-117-23-22-0024
>
Septic
>
1988-04-28 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 1:50:27 PM
Creation date
6/26/2025 1:44:39 PM
Metadata
Fields
Template:
x Address Old
House Number
20
Street Name
Cygnet
Street Type
Place
Address
20 Cygnet Place
PIN
0411723220024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1:-20 <br />MOUND DESIGN PROCEDURE (Continued) <br />(For Flows up to 1200 gpd) <br />G.3. Calculate basal width ratio <br />by dividing rock layer <br />loading rate of 1.20 gpd/ft2 <br />by allowable soil loading <br />rate; <br />1.20 gpd/ft2 ; 0.9dgpd/ft2 <br />Check this value on page E-16. <br />4. Multiply basal width ratio by <br />rock layer width to get <br />required basal width; <br />Z.0 x LO ft = 20 ft <br />H. Downslope Dike Width <br />11.2.f. Multiply dike multiplier by <br />downslope mound height to get <br />downslope dike width; <br />3.ti/ x -7.`/ _ //.6ft <br />g. Compare the values of stela :{ l <br />and step 11. 2. f . Select the <br />greater of the two values as <br />the downslope dike width; <br />//. 6 f e e t <br />1. If landslope is 3% or more, i <br />subtract rock layer width <br />from basal width to obtain <br />minimum downslope dike toe width <br />20 ft - /O ft = eft <br />Calculate upslcpe dike width <br />using; upslope mound height <br />and upslope dike multiplier <br />f_rot� page E_-18; 0 ft <br />'total mound width is the sure <br />of upslope dike width plus rock <br />layer width plus downslope dike <br />width; <br />BQft + /0 ft +//6ft=?9.6ft <br />2. Calculate mound height at edge <br />3. If <br />landslope is 2.9 percent or <br />of <br />rock layer on downslope side; <br />less, <br />basal width includes both <br />a. <br />Determine depth of clean sand <br />the <br />upslope and do•..nslope dike <br />fill at upslope edge of rock <br />widths. <br />b. <br />layer: _ / feet <br />`?ultiply rock layer width by <br />a. <br />Calculate downslope dike width <br />landslope to determine drop <br />using stets H.2.a. hruus;h <br />in elevation; <br />H.2.f; feet <br />/D x Y `/, = 100 =O.`i f t <br />b. <br />Calculate upslope dike width <br />c. <br />Add drop in elevation Co depth <br />using upslope mound height and <br />dike multiplier frog. Page E-18; <br />of clean sand at upslope edge <br />ft - ft <br />of rock layer to get depth of <br />clean sand at downslope edge <br />c. <br />Add downslope dike width to <br />of rock layer. <br />upslope dike width to rock <br />d, Y f t + / f t = /. Y ft <br />layer width to get total mound <br />d. <br />Add depth of clean sand at down- <br />width; <br />slope edge to depth of rock <br />—ft + ,ft + _ft = _ft <br />layer to depth of soil backfill <br />d. <br />Compare total mound width to <br />to get mound height at do -%%slope <br />required basal width from step <br />edge of rock layer; <br />G.4. If total mound width is <br />/, / f t +49,7Sf t + /, 2S'f t = 3. Y f t <br />grr_a ter than required basal <br />e. <br />Enter table on page E-18 with <br />width, use calculated dike <br />landslope and downslope dike <br />widths. If required basal <br />ratio. Select dike multiplier <br />width is greater than total <br />of <br />mound width, increase downslope <br />dike width. <br />
The URL can be used to link to this page
Your browser does not support the video tag.