My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5128
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 5100 - 5199 January 12, 2004 - June 14, 2004)
>
Resolution 5128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 11:11:36 AM
Creation date
11/10/2015 11:11:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, . <br /> � O� <br /> O O <br /> • �� S CITY of ORONO <br /> � � <br /> ti <br /> ��l �Gti <br /> RESOLUTION OF THE CITY COUNCIL <br /> `9kESIIOg' NO. S � � � <br /> 8. Both lots will gain access to Watertown Road via a shared driveway in proposed <br /> Outlot A. Lot 2 shall have no separate access to Watertown Road. <br /> 9. The property contains a creek which flows through an extensive wetland system <br /> upstream of the property. The Orono Surface Water Management Plan indicates , <br /> that the Normal Water Level for the large wetland basin just to the north of the <br /> properly is elevation 963.5', with the High Water Level (100-year flood level) <br /> at elevation 970.4'. The top of the bank of the channel at the constriction area <br /> in Lot 1 is at approximate elevation 968.0', and closely matches the delineated <br /> ' wetland boundary. Per the recommendation of the City Engineer, the OHWL for <br /> setback and lot area calculation purposes for the property should be established <br /> at the wetland boundary elevation of 968'. The proposed driveway crossing will <br /> include a culvert which has been sized to meet all anticipated stormwater <br /> demands. However, to ensure that no upstream homes are flooded if the culvert <br /> � plugs, the City Engineer has indicated the top surface of the driveway crossing <br /> should be lowered from elevation 973.0' to 972' to allow for an open channel <br /> overflow that will be 2' lower than the lowest floor of the upstream residences <br /> (974' min.). The culvert should be an arch RCP to allow this reduction in height. <br /> , The RFPE, i.e. the minimum floor elevation for any building, should be <br /> established at elevation 974'. In proposed Lot 1, based on the topography and <br /> site plan submitted by the applicant, neither the buildable area nor the septic <br /> sites will be impacted by floodplain and OHWL elevations. <br /> 10. The creek driveway crossing will require filling within floodplain as well as <br /> within the wetland. A number of variances are required to allow the creek <br /> crossing. The specific issues with the driveway which require variances are: <br /> a) Portions will be within 75' of the OHWL of the creek where no <br /> hardcover or grading is allowed except by variance per Section 78-1286; <br /> b) Portions will be within a delineated wetland or within 26' of the wetland, <br /> . where no grading or filling is normally allowed. <br /> Grading and filling in or near a wetland, and crossing of the creek, are also <br /> subject to WCA regulations administered for Orono by the Minnehaha Creek <br /> Watershed District. <br /> s <br /> Page 3 of 9 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.