My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
05-27-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
6/6/2025 2:33:24 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/27/2025
Retention Effective Date
5/27/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
analysis or survey was performed as part of this report. <br />2.2 PROPOSED TRAIL IMPROVEMENTS <br />The proposed Trail Section is shown in Figure No 1 <br />The Proposed project layout is shown in Figure No 2: <br />• 4-foot wide pedestrian only path, from the existing public use park to <br />West Branch road <br />After analysis of alternatives, the following is recommended: <br />• Construct the trail on the west side of North Arm Drive, where there are <br />fewer existing conflicts with existing driveways and power poles as well <br />as landscaping and manicured lawns <br />• The ongoing development at the former Lakeview Golf course site <br />shows plans for internal roadways and internally served streets, therefore <br />no new conflicts will be created with a west side trail alignment <br />• Construct a clear opening including 4-feet of trail and 1-foot on either <br />side of level green space so that the trail may be maintained and mowed <br />• In order to establish ADA compliance now or in the future it is likely <br />that any conflicting or crossing driveways will need to be reconstructed <br />where the trail crosses, at some expense <br />• As directed by City Staff and Parks Commission, the proposed section to <br />be constructed is a pedestrian only facility that will have a crushed <br />limestone gravel surface, in keeping with the nature of the area, and will <br />not be paved <br />• The proposed section to be constructed on the west side of North Arm <br />Drive will require removal of some trees and brush, which we have <br />observed to be primarily volunteer growth <br />• The proposed section will also require some grading to be constructed to <br />ADA standards for grade, and will be graded into the berm on the west <br />side of the roadway <br />R-4 <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.