Laserfiche WebLink
Payment shall be due to the City at the time of execution of this Agreement as its Park <br />Dedication Fee for Lot 1, Block 1, and Lot 2, Block 2. No Park Dedication Fees are due for Lot <br />1 or Lot 3, Block 2, as those lots have previously been developed and appropriate fees paid. <br />19. SUMMARY OF FEES AND CASH REQUIREMENTS. The following is a <br />summary of the fees and cash requirements under this Agreement which must be furnished to the <br />City at the time indicated: <br />FEE or CHARGE <br />Storm Water and Drainage Trunk Fee <br />Park Dedication <br />SAC and WAC <br />MCES charges <br />Escrow for City Expenses/Engineering/Legal <br />Total Cash Requirements before Plat release <br />Date Payable <br />Before Plat release <br />Before Plat release <br />With Building Permit <br />With Building Permit <br />Before Plat release <br />$229,864.00 <br />20. SPECIAL PROVISIONS. The following special provisions shall apply to the <br />development of the platted property and the Public Improvements: <br />A. Before the first new building is occupied, the drainage from the existing <br />parking lot onto property in the Orono Industrial Park subdivision shall be redirected to remain <br />within the Plat until it enters the public drainage system. <br />B. The conditional use permit for outdoor storage (#01-2612 ) shall be <br />revised to relocate the outdoor storage prior to construction of Orono Industrial Boulevard or <br />issuance of a building permit for Lot 1, Block 1. <br />C. Construction traffic access and egress for grading, public utility <br />construction, and street construction is restricted to access the subdivision via Old Crystal Bay <br />Road or Wayzata Boulevard <br />D. Construction hours are 7 AM to 10 PM Monday through Saturday. <br />132281 v11 <br />WPM <br />131 <br />