My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-09-20 Letter, Documents Req for Permit
Orono
>
Property Files
>
Street Address
>
C
>
Cristofori Circle
>
50 Cristofori Circle - 31-118-23-44-0004
>
Correspondence
>
1990-09-20 Letter, Documents Req for Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 12:37:01 PM
Creation date
5/22/2025 12:21:17 PM
Metadata
Fields
Template:
x Address Old
House Number
50
Street Name
Cristofori
Street Type
Circle
Address
50 Cristofori Circle
PIN
3111823440004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br />Post Office Box 66 • Crystal Bay, Minnesota 55323 • Municipal Offiees <br />On the North Shore of Lake Minnetonka <br />September 20, 1990 <br />Mary Rippentrop <br />MLR Construction of Minneapolis, Inc. <br />10823 53rd Avenue North <br />Plymouth, MN 55442 <br />RE: 4280 Bayside Road <br />Dear Mr. Rippentrop: <br />The Building and Zoning Department is in receipt of your <br />app'tication for a building permit, which was received by this <br />office on September 12, 1990. A review of the material submitted <br />indicates the following items needed for review are missing: <br />1. Certificate of Survey certifying the staked location of <br />the proposed house. Your surveyor must stake the house and <br />appropriate offsets, and certify those on a Certificate of <br />Survey. The survey must include dimensions of all proposed <br />buildings and reference dimensions measured perpendicular to <br />the front and side lot lines. Also, provide elevations for <br />the top of foundation, garage floor and all other floors. <br />2. Provide a final detailed grading plan showing existing <br />and proposed contours, along with detailed designs for all <br />proposed retaining walls. <br />3. We will need two full sets of final. plans submitted. <br />4. Energy calculations must be submitted. <br />5. The septic system design is incomplete in that we need <br />a design layout for the septic tanks and a proposed well <br />location, a proposal. for tank sizes, and a detailed pump <br />station design calculation worksheet. <br />BUILDING & ZONING - 473.7357 • ADMINISTRATION & FINANCE - 473.7358 • PUBLIC WORKS - 473.7359 <br />ASSESSING FAX - 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.