My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-03-30 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Cristofori Circle
>
50 Cristofori Circle - 31-118-23-44-0004
>
Septic
>
1992-03-30 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 12:37:01 PM
Creation date
5/22/2025 12:18:36 PM
Metadata
Fields
Template:
x Address Old
House Number
50
Street Name
Cristofori
Street Type
Circle
Address
50 Cristofori Circle
PIN
3111823440004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-20 <br />MOUND DESIGN PROCEDURE (Continued) <br />(For Flows up to 1200 gpd) <br />G.3. Calculate basal width ratio 11.2.f. Multiply dike multiplier by <br />by dividing rock layer dou•ns.lop, mound height to get <br />loading rate of 1.20 gpd/ft2 downslope dike width; <br />by allowable soil loading S.2C x ,�,� _ /�. 9 f t <br />rate; <br />1.20 gpd/f t2 - g9.Apd/ f t2 = 1. D g • Compare the values of step 11.1 <br />and step 11.2.f. Select the <br />Check this value on page E-16. greater of the two values as <br />4. Multiply basal width ratio by the downslope dike width; <br />rock layer width to get / ,?. 9 feet <br />required basal width; h Calculate upslope dike width <br />2- O x /O f t =_f t using upslope mound he-,ght <br />and upslope dike multiplier <br />H. Downs_i ope Dike Width and <br />a e r•-18; <br />1..s X�=�Zft <br />1. If landslope is 3% or more, i. total mound width is the sum <br />subtract rock layer width of upslope dike widtlil�lus rock <br />from basal width to obtain layer width plus downslope dike <br />minimum downslope dike toe width width; <br />20_ft - /p ft = /p ft 9.7ft + /D ft +/p9ft =.?86ft <br />2. Calculate mound height at edge 3. If landslope is 2.9 percent or <br />of rock layer on downslope side; less, basal width includes both <br />a. Determine depth of clean sand the upslope and downslope .'ike <br />fill at upslope edge of rock widths. <br />layer: /. O feet <br />b. Multiply rock layer width by a. Calculate do%.nislope dike width <br />landslope to determine drop using steps H.2.a. through <br />in elevation; 11.2.E; feet <br />x d % - 100 = l%.6 f t b. Calculate upslope dike width <br />c. Add drop in elevation to depth using; upslope mound height and <br />of clean sand at upslope edge dike multiplier from Page E-18; <br />of rock layer to get depth of x ft = ft <br />clean sand at downslope edge c. Add downslope dike width to <br />of rock layer. upslope dike width to rock <br />0. b ft + /. Of t = 1.6 f t layer. width to get total mound <br />d. Add depth of clean sand at down- width; <br />slope edge to depth of rock ft + ft + ft ft <br />layer to depth of soil backf ill — <br />to get mound height at downslope d• Compare total mound width to <br />ed e of rock layer; <br />required basal width from step <br />�.Yft +J."5ft +1.25ft =.7.6ft G.4. If total mound width is <br />greater than required basal <br />e. Enter table on page E-18 with width, use calculated dike <br />landslope and downslope dike widths. If required basal <br />ratio. Select dike multiplier width is greater than total <br />of 6 y mound width, increase downslope <br />dike width. <br />
The URL can be used to link to this page
Your browser does not support the video tag.