Laserfiche WebLink
SYSTEM DESIGN FOR MLR CONSTRUCTION <br />McCLOUD RESIDENCE <br />in the SE 1/4 of SECTION 31-118-23 <br />ORONO, MINNESOTA <br />10-9-90 <br />Additional information follows for the installation of a <br />pressure mound system. In addition to those requirements, two <br />septic tanks of 2000 gallon capacity each are recommended along <br />with a 1000 gallon pumping tank. <br />All construction traffic must be kept off both the primary <br />and the alternate septic sites. Grad-f'--� must be done to divert <br />some small drainageways around the mou,..' area and to keep other <br />runoff water away. All co,.-�truction and materials must adhere <br />to the provisions of the C_ty of Orono. <br />If any other information is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Mark S. Gronberg, <br />PCA certified <br />