Laserfiche WebLink
TEE TO TEE LATERAL -MANIFOLD CONSTRUCTION <br />Topsoil <br />OeA1 Be -or <br />Clean Sand <br />Grass Cover <br />Hay or Straw Covered <br />by Layer of Red Rosin <br />Paper (or nylon fabric) <br />Perforation in Cap Near <br />Crown of Pipe <br />Perforations at Lateral <br />Invert <br />Rock Layer <br />JOB NO. 1962 TOM SMITH ASSOCIATES Inc <br />