My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-2025 - Agenda Packet Planning Commission - Planning Commission Packet
Orono
>
Planning Commission
>
2025
>
05-19-2025 - Agenda Packet Planning Commission - Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
5/21/2025 3:21:49 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Planning Commission Packet
Document Date
5/19/2025
Retention Effective Date
5/21/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> Created: 2025-02-26 08:25:08 [EST] <br />(Supp. No. 21) <br /> <br />Page 18 of 33 <br />(13) Trail plan; and <br />(14) Lighting plan. <br />Approval of the master development plan shall indicate approval of the listed items in subsections (b)(1)—(b)(14) <br />of this section and shall occur in conjunction with rezoning of the property to RPUD. After rezoning the property to <br />RPUD, nothing shall be constructed on the RPUD site except in conformance with the approved plans and this <br />section. The procedure for notification of and public hearing on the master development plan shall be the same as <br />required for a zoning map amendment by this chapter. <br />(c) Development agreement/financial guarantee. Following the approval of the master development plan but <br />prior to final plan approval, the applicant shall enter into an agreement with the city relating to the terms of <br />the RPUD development, and shall also provide such financial guarantees as the city requires or deems <br />necessary. Such agreement may take the form of: <br />(1) A development contract; <br />(2) A site improvement performance agreement; and/or <br />(3) Another form of binding instrument as may be required by the city. <br />(d) Final site and building plan. Approval of a final site and building plan for the entire RPUD or for specific parts <br />of the RPUD shall be subject to the procedures outlined in this division. The final site and building plan shall <br />contain information as required by the city, including the following: <br />(1) Detailed utility, street, grading and drainage plans; <br />(2) Detailed building elevations and floor plans; <br />(3) Detailed landscaping, sign and lighting plans; and <br />(4) Detailed trail plan. <br />(e) Substantial compliance. The final site and building plan shall be in substantial compliance with the approved <br />master development plan. Substantial compliance shall mean: <br />(1) Buildings, parking areas, roads and trails are in substantially the same location as previously approved; <br />(2) The number of residential living units has not increased or decreased from that approved in the master <br />development plan; <br />(3) The gross floor area of any individual building has not been increased from that approved in the master <br />development plan; <br />(4) There has been no increase in the number of stories in any building; <br />(5) Open space has not been decreased or altered to change its original design or intended use; and <br />(6) All special conditions required on the master development plan by the city have been incorporated <br />into the final site and building plan. <br />Approval of a final site and building plan shall signify approval of all plans necessary prior to application for a <br />building permit, subject to conformance with any conditions on the approval and subject to other necessary <br />approvals by the city. <br />(f) Simultaneous review. Applicants may combine the final site and building plan review with the master <br />development plan review by submitting all information required for both stages simultaneously. <br />(g) Basis for approval; conditions. In evaluating a site and building plan, the planning commission and city council <br />shall base their recommendations and actions regarding approval of a RPUD on a consideration of the <br />following: <br />70
The URL can be used to link to this page
Your browser does not support the video tag.