My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-2025 - Agenda Packet Planning Commission - Planning Commission Packet
Orono
>
Planning Commission
>
2025
>
05-19-2025 - Agenda Packet Planning Commission - Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
5/21/2025 3:21:49 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Planning Commission Packet
Document Date
5/19/2025
Retention Effective Date
5/21/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Inspection/Analysis/Monitoring Fees <br /> <br /> <br />A site inspection and monitoring by District staff will be performed where the activity involves: <br /> <br />• a commercial/industrial/multi-family residential development <br />• a single family residential development greater than 5 acres or of any size if within the <br />Minnehaha Creek subwatershed <br />• any alteration of a floodplain or wetland <br />• dredging within the beds, banks or shores of any protected water or wetland <br />• a violation <br />• any project which in the judgment of the District staff should be inspected due to project <br />location, scope, or construction techniques <br /> <br /> <br />In these cases, the applicant shall pay to the District a fee equal to the actual costs of field <br />inspection of the work, including investigation of the area affected by the work, analysis of the <br />work, and any subsequent monitoring of the work, which in the case of a violation shall be at <br />least $35. <br /> <br /> <br /> <br />Standard Fee Schedule <br /> <br />District Professional Staff: $70.07/hour <br />District Administrative Staff: $50.74/hour <br />Consulting Engineer/Technician: Contracted rate <br />District Counsel: Contracted rate <br />Permit Application Fee: $10.00 <br />Wetland Buffer Signs: $2.85/sign <br />Black and White Photocopy Costs: $0.25/page + actual staff time <br />Color Photocopies: $1.00/page + actual staff time <br />Electronic Records: cost of production <br /> <br />26
The URL can be used to link to this page
Your browser does not support the video tag.