My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-19-2025 - Agenda Packet Planning Commission - Planning Commission Packet
Orono
>
Planning Commission
>
2025
>
05-19-2025 - Agenda Packet Planning Commission - Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
5/21/2025 3:21:49 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Planning Commission Packet
Document Date
5/19/2025
Retention Effective Date
5/21/2025
Retention
Permanent After File Date
Protection
Public
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
5/21/2025 3:22 PM
Modified:
5/21/2025 3:22 PM
Text:
mailto:jsonnek@charlescudd.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2545 Dunwoody Ave. Shoreline Restoration – Improvement Project Description April 2, 2025 <br /> <br /> <br /> Project Location: <br /> 2545 Dunwoody Ave. Orono <br /> Project Contact: John Sonnek, VP of Constr. <br /> Charles Cudd Co, LLC <br /> jsonnek@charlescudd.com <br /> 612.889.3530 <br /> <br /> <br />The plan is to rebuild the retaining walls on both sides of the new stairs replacing the existing. There are a <br />combination of medium to large modular granite wall stones for the retaining walls, and poured concrete stairs <br />with a poured “curb-wall” on the sides of the stairs to provide safe footing and a solid mount for the railing. The <br />proposed plan would have minimal grade changes so the dirt exchange will be minimal. <br />The final proposed change at the shoreline is to rearrange the rip-so that a 10’ x 20’ sandblanket can be installed. <br />This will allow for a minimal cut to create the area needed for the sandblanket. All the necessary BMP’s will be <br />in place per the erosion control plan that has been submitted to MCWD for approval. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.