My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5299
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 5200 - 5299 (June 28, 2004 - April 11, 2005)
>
Resolution 5299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:43:08 PM
Creation date
11/9/2015 3:43:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .� <br /> � O� <br /> O O <br /> � �� CITY of ORONO . <br /> � g '� ti�' <br /> �� �G RESOLUTION OF T�E�CI�TY�COUNCI� <br /> `�kEs�iog' NO. � <br /> Residential total area=44.26 acres <br /> 44.26 acres x$15,010/acre=$664,343 Total S&W Connection Charges <br /> • Proration: Lofts units/total units=portion due for Lofts <br /> Lofts=57 units Total units(after Lofts reduction)= 157 uiuts <br /> 57/ 157=0363 x$664,343=$241,157 <br /> 4. Payment of Park Dedication Fee for Development of the Property in the amount <br /> of $185,250 based on the following formula as established in Exhibit M of the Planned Unit <br /> Development No. 4 Agreement: <br /> Establislied value of residential portion of Stonebay=$4,622,083 <br /> 8%Park Fee=0.08 x$4,622,083=$369,767 <br /> Min/max raiige check: (inust be between$3,250 and$5,550 per unit) <br /> . $369,767/157 units=$2355/unit(below required min/max range) <br /> Mnumum Fee applied: 157 units x$3,250/unit=$510,250 <br /> Proration: Lofts units/total units=portion due for Lofts <br /> 57 units x#3,250/unit=$185,250 <br /> • WHEREAS, City staff and consultants have reviewed the plans for this PUD <br /> application and hereby specify approval or conditional approval of each attached plan and <br /> identify them as part of the official record for Planned Unit Development No. 4B: <br /> . 1. Approval of site plan per "Preliminary Site Plan" Sheet C2.1 dated 2/21/O5. <br /> 2. Approval of"Preliminary Grading Plan" per Sheet C3.1 dated 2/21/O5, subject to <br /> any additional requirements of the Minnehaha Creek Watershed District and subject to any <br /> additional requirements and conditions specified by the City Engineer upon review of final plans. <br /> 3. Approval of "Preliminary Utility Plan" per Sheet C4.1 dated 2/21/O5, subject to . <br /> any additional requirements specified by the City Engineer upon review of final plans. <br /> � 4. Approval of"Preliminary Landscape Plan" per Sheet L2.1 dated 3/9/O5, subject to <br /> conditions established within the PUD No. 4B Agreement. <br /> 5. Approval of conceptual floor plans for the building per the "Concept Layout" by <br /> Bruce Lehrer Architects (undated), which include 57 dwelling units and one guest unit, a single <br /> elevator located near the midpoint of the building, and lower level parking for 95 vehicles. <br /> 6. Approval of building exterior elevations and materials per Sheet A-2 by Bruce <br /> • Lehrer Architects last dated 1/21/O5, subject to submittal of facade elevations for all sides of the <br /> building to be similar in variety and percentage mix of materials to the facades shown on said <br /> Sheet A-2. Building materials required by this approval are as indicated on said Sheet A-2 and <br /> Page 3 of 7 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.