My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
05-12-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
5/12/2025 3:04:06 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/12/2025
Retention Effective Date
5/12/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
152229v01 <br />SMM:06/07/2010 <br />6 <br />Within thirty (30) days after completion of the grading and before the City approves individual building <br />permits the Developer shall provide the City with an “as constructed” grading plan certified by a registered <br />land surveyor or engineer that all ponds, swales, and ditches for public drainage have been constructed on <br />public easements or land owned by the City. Notwithstanding the foregoing, the City may issue building <br />permits to the Developer, prior to completion of all grading, provided the City Engineer has determined that <br />adequate erosion control measures are in place. The “as constructed” plan shall include field verified <br />elevations of the following: a) cross sections of ponds; b) location and elevations along all swales, <br />wetlands, wetland mitigation areas if any, and ditches, locations and dimensions of borrow areas/stockpiles, <br />and installed "conservation area" posts; and c) lot corner elevations, and house pads. The City will withhold <br />issuance of building permits until the approved certified grading plan is on file with the City and all erosion <br />control measures are in place as determined by the City Engineer. The Developer certifies to the City that <br />all lots with house footings placed on fill will have been monitored and constructed to meet or exceed <br />FHA/HUD 79G specifications. The Developer agrees to stake, for demonstration purposes only, the <br />proposed areas to be dedicated to the City for possible use as parks. <br />16.CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted <br />from construction work by the Developer, builders, subcontractors, their agents or assigns. Prior to any <br />construction on the Land, the Developer shall identify in writing a responsible party and schedule for <br />erosion control, street cleaning, and street sweeping. <br />17.CONSTRUCTION AND MAINTENANCE OF IMPROVEMENTS. <br />Developer shall enter into and execute a Private Road Easement and Maintenance Declaration. Upon <br />completion of the Improvements, the City shall inspect the Improvements and notify Developer if any of the <br />Improvements do not conform to the requirements of this Contract. <br />18.CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION <br />OBSERVATION. The Developer shall pay a fee for engineering administration. City engineering <br />administration will include monitoring of construction observation, consultation with Developer and its <br />217
The URL can be used to link to this page
Your browser does not support the video tag.