My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
05-12-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
5/12/2025 3:04:06 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/12/2025
Retention Effective Date
5/12/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
152229v01 <br />SMM:06/07/2010 <br />4 <br />“security” is released, the Developer shall supply the City with a complete set of reproducible "as <br />constructed" Plans, and an electronic file of the "as constructed" Plans in an auto CAD file based upon the <br />Hennepin County coordinate system, all prepared in accordance with City standards. Developer will install <br />any required sidewalks and trails just prior to the installation of the final lift of asphalt. <br />9.IRON MONUMENTS. In accordance with Minnesota Statutes Section 505.02 and the <br />Orono City Code, the final placement of iron monuments for all lot corners must be completed before the <br />“security” is released. The Developer's surveyor shall submit a written notice to the City certifying that the <br />monuments have been installed. <br />10.PERMITS. The Developer shall obtain or require its contractors and subcontractors to <br />obtain all necessary permits, including but not limited to the following to the extent required: <br />Hennepin County for County Road Access and Work in County Rights-of-Way <br />DNR for Dewatering <br />City of Orono for Building Permits <br />Minnehaha Creek Watershed District for erosion control permit and storm water <br />management permit <br />NPDES Permits (National Pollutant Discharge Elimination Systems) issued by <br />MPCA <br />11.DEWATERING. Due to the variable nature of groundwater levels and stormwater <br />flows, it will be the Developer’s and the Developer’s contractors’ and subcontractors’ responsibility to <br />satisfy themselves with regard to the elevation of groundwater in the area and the level of effort needed to <br />perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all <br />applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations <br />permits shall also be strictly followed. <br />12.TIME OF PERFORMANCE. The Developer shall install all Improvements as <br />contemplated by Section 8 and the approved Plans by November 30, 20____, with the exception of the final <br />wear course of asphalt on streets. The final wear course on streets shall be installed between August 15th <br />and September 15th the first summer after the base layer of asphalt has been in place one freeze thaw cycle. <br />The Developer may, however, request an extension of time from the City. If an extension is granted, it shall <br />215
The URL can be used to link to this page
Your browser does not support the video tag.