My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
05-12-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
5/12/2025 3:04:06 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/12/2025
Retention Effective Date
5/12/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. 7586 <br /> <br /> <br />3 <br /> <br />The current 2025 SAC is $2,485.00 per unit which would result in a total of $34,790.00 <br />(or 14 x $2,485) required to connect all buildings in 2025. <br /> <br />i. Building 1: 1 SAC Unit = $2,485 <br />ii. Building 2: 3 SAC Units = $7,455 <br />iii. Building 3: 4 SAC Units = $9,940 <br />iv. Building 4: 4 SAC Units = $9,940 <br />v. Building 5: 2 SAC Units = $4.970 <br /> <br />c. Water and Sewer Connection Fee: The City of Orono does not have a per unit <br />breakdown for industrial uses. Following Met Council’s logic, the City finds it appropriate <br />to apply the same SAC unit determination when applying the City’s water and sewer <br />area connection fees. <br /> <br />The water and sewer area connection fees for each building will be collected with each <br />building permit. Based on the City’s official 2025 Fee Schedule, a $4,370.00 water unit <br />connection fee and $6,000.00 per sewer unit will be applied (total $10,370.00 per unit) <br />as follows: <br /> <br />i) Building 1: 1 SAC Unit = $10,370.00 <br />ii) Building 2: 3 SAC Units = $ 31,110.00 <br />iii) Building 3: 4 SAC Units = $ 41,480.00 <br />iv) Building 4: 4 SAC Units = $ 41,480.00 <br />Building 5: 2 SAC Units = $ 20,740.00 <br /> <br />All 5 buildings will result in 14 SAC units, totaling $145,180.00 (14 x $10,370.00) to connect <br />to the City’s water and sewer systems. <br /> <br />9. The City Clerk shall release the plat documents for filing only upon certification by the City <br />Attorney, Community Development Director, and City Engineer that all requirements of the <br />platting regulations have been satisfied. <br /> <br />10. Phased Development / Staging: Phase 1 will include construction of Building 1 and <br />Building 2 as shown on Exhibit A. Approval of the Final Plat, recording of the development <br />agreement, and easement must be completed before building permits are issued. Future <br />Final Plat approval will be required when Phase 2, Buildings 3-5 are ready to be <br />constructed. <br /> <br />11. Upon substantial completion of Buildings 1 and 2, executed Mylars must be submitted to the <br />City for recording for Phase 1 Final Plat. The City will not conduct the final building <br />inspection or issue occupancy certificates for the buildings until the Mylars are recorded. <br /> <br />173
The URL can be used to link to this page
Your browser does not support the video tag.