My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-05-16 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Creekwood Trail
>
4785 Creekwood Trail - 30-118-23-33-0009
>
Septic
>
1990-05-16 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 4:04:42 PM
Creation date
5/8/2025 3:59:08 PM
Metadata
Fields
Template:
x Address Old
House Number
4785
Street Name
Creekwood
Street Type
Trail
Street Direction
4785 Creekwood Trail
PIN
3011823330009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOWNSLOPE DIKE WIDTH <br />. If landslope is 3% or more, subtract rode layer width from <br />adsorption width to obtain minimum downslope dike toe <br />ft« to ft* ^ ft <br />t Calculate mound height at edge of rock layer on downslope <br />side; <br />a. Determine depth of dean sand fill at upslope edge of rode <br />layerS^porsfum /■ Q feet <br />b. Multiply rock layer width by landslope to determine drop <br />in Slope Difjfgrence <br />to x_3_%»ioo. ft <br />c Add depdi of dean sand depth of dean sand for <br />separation at downslope edge to depth of rode layer to <br />depth of soil badefiU to get mound height at downslope <br />edge of rode layer; <br />ft* /.Q ft-l- -S' ft* ftw <br />d. Enter table on page E-18 with landslope and o /^pe <br />dikeratio. Select dike multiplier of 4 <br />e. Multiply dike multiplier by downslope mound height <br />to get downriope dike width: 3.3 x ft <br />g. Compare the values of step G.1 and Step G^f. Select the <br />greater of the two values as the downslope dike width; <br />»S" feet <br />h. Calculate upslope dike widdi using upslope mound <br />height and upslope dike multiplier from page E-18; <br />3.0 X 3-^9 - II ft <br />L Total »d width is the stun of upslope dike width plus <br />rodclayi^ width plus downslope dike width; <br />.11__iQ ft^ ft» JU ft____________ <br />3. If landslope is Z9 percent or less, basal widdi includes both the <br />upslope and downslope dike widdis. <br />a. Calculate downslope dike width using steps G^a. <br />through G.24;____feet <br />b. Calculate upslope dike width using upslope mound <br />height and dike multiplier from Page E-18; <br />____X____ft-____ft <br />c. Add downslope dike width to upslope dike width to rock <br />layer width <br />____ft-f____ft+____ft-____ft <br />E-18
The URL can be used to link to this page
Your browser does not support the video tag.