Laserfiche WebLink
Loti,BlklrPainters Woods <br />Keep all heavy equipment off of the proposed treatment area before and <br />after construction as much as possible* The treatment area should be <br />marked off before construction. <br />With proper installation and maintenance, this system should have no <br />problem in treating septic effluent effectively. <br />Recommend to pump the septic tank every year if there is only 1 tank <br />& every 2 years if there are 2 tanks* <br />Steven B. Schirmers <br />SBS/ds