My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-03-02 Application for Septic Permit
Orono
>
Property Files
>
Street Address
>
C
>
Creekwood Trail
>
4745 Creekwood Trail - 30-118-23-33-0008
>
Permits/Inspections
>
1992-03-02 Application for Septic Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2025 11:55:47 AM
Creation date
5/7/2025 11:51:31 AM
Metadata
Fields
Template:
x Address Old
House Number
4745
Street Name
Creekwood
Street Type
Trail
Address
4745 Creekwood Trail
PIN
3011823330008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
il�� <br />APPLICATION FOR SEPTIC SYSTEM PERMIT � �-f <br />CITY OF ORONO <br />Box 66 (1335 So Brown Rd) <br />Crystal Bay, NN 55323 <br />General Instructions: <br />1. You may apply for septic system permits by mail or in person at the <br />City offices. However, permits will not be sailed out and must be <br />picked up in person at the City offices. <br />2. Permits are not valid until you receive a permit card. <br />3. Work must not begin unless the permit card is available on the job <br />site. <br />4. Permits will be issued only to contractors holding a City of Orono <br />Septic System Installer's License. <br />5. All work must be done in accordance with the approved septic system <br />design. Design reports are not considered approved unless accompanied <br />by the "City of Orono Septic System Approval" cover sheet signed by <br />the City Inspector. <br />6. The following inspections will be required for all septic systems: <br />a) Pre -installation site inspection to include inspector, installer, <br />and general contras: nor. <br />b) Tank installation prior to covering. <br />c) Drainfield trench installation prior to covering. For mounds, <br />ir.�pection is required after rough -up but prior to sand placement <br />(sand will be jar tested for silt content), and again during <br />pressure distribution piping installation in the rock bed. <br />d) Final inspection to verify proper final cover depths and to <br />verify that all pump station (where required) components are <br />functional and comply with codes. <br />7. Individual holding MPCA Installer Certificate shall be present during <br />installation. 24-hour notice is required for all inspections. <br />**�s�::::**�ft�sfs�����::�*�tff*f�:/�:::::•:f:��tsi.•*�tt��**f*:f:*:�•::,�*:* <br />JOB SITE ADDRESS: q7 <br />Occupancy Type: Residential �� Commercial Other <br />Owner's Name: (` ��Y� , L�l�, Phone: <br />Mailing Address: City: Zip: <br />Septic Contractor's Name:&,e,& d A 6c11i wao Bus. Phone: '?7 <br />Mailing Address: //s��s �a���' �� City: <br />•:t:�:s,►f*t**!�* ��::mot:::ftss :* :�*�:se�*�f�t*f <br />over - <br />
The URL can be used to link to this page
Your browser does not support the video tag.