My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-11-13 MPCA Septic System Design Req
Orono
>
Property Files
>
Street Address
>
C
>
Creekwood Trail
>
4745 Creekwood Trail - 30-118-23-33-0008
>
Septic
>
1991-11-13 MPCA Septic System Design Req
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2025 11:55:47 AM
Creation date
5/7/2025 11:49:06 AM
Metadata
Fields
Template:
x Address Old
House Number
4745
Street Name
Creekwood
Street Type
Trail
Address
4745 Creekwood Trail
PIN
3011823330008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eiden Constructic,r, <br />Noveri ),:?r 13 , 1991 <br />The quantity of of fluent dr- livered eaCh puri1p cy._le should be <br />at least 140 gallc-ris, but more than gallona per <br />cy.=1e. <br />The amount of efflt-,•-nt pump--d per cycle depends c-n the <br />surface, area of tli•.• pumpinr, tank: and the setting of the purnp <br />start and stop. A relatively large pumping tan1: surface <br />area is needed with a sriiall puriip out depth. <br />There are several pumping situations that ._an be used with <br />this on -site sewaq� treatment system- These situations <br />should be in cone-urrence with the City Ordinance- and the <br />contractor installing the system. <br />Inspection Pipe <br />--------------- <br />A vertical inspeci-ion pipe at least 1 1/2 inches in diameter <br />to the bottom shall be installed in the rock: layi_r- of tfle <br />mound. The inspection pipe shall be located at an end <br />opposite from where the sewage tank effluent enters the rock: <br />layer. The inspection piper shall have 3/8 inch, cw larger, <br />perforations spaced vertically no more than sir, inches <br />apart. At least two p--rforations shall be located in the <br />rock layer. The inspection pipe shall extend t-D the bottom <br />of the rock layer with an elbow beneath it and shall be <br />capped flush with or above the finished grade. <br />
The URL can be used to link to this page
Your browser does not support the video tag.