Laserfiche WebLink
Parks Commisison <br />Discussion Document 4/14/25 <br />PROJECTS <br />Park Type Park Recent Projects Background 2025 Adopted Goal Future Focus <br />Active Parks & Playgrounds <br />Antoine Conducted a listening session in 2023 to <br />engage the neighborhood in future park <br />improvements <br />Determine needs and potential improvements of <br />park (create Concept) <br />Bederwood Built soccer field and parking lot (2019)Playground upgrades, baseball irrigation <br />Casco Point Ice Rink Added lighting for night usage (2021) <br />Crystal Bay Park Playground upgrades (2022)Establish a Master Plan <br />Hackberry Purchased the house in 2014, with the <br />intent of expanding the capabilities. <br />Parking, trees, drainage, and field <br />conditions are all problems we need to <br />address. <br />- Initiate grant applications <br />- Move to Design phase of project. <br />Mountain Bike Trail Concept is complete Move to Design <br />Navarre Park Added sport court in 2018(?) <br />Pickelball Developed a Concept in 2024 Once fundraising is established, move to Design <br />phase <br />Summit Beach Developed a Master Plan in 2022 Move to Design based on Master Plan <br />Nature Parks <br />Beaches <br />(Casco, Lydiard, Sandy) <br />Added dock at Casco and swim platform at <br />Sandy <br />Big Island Developed park in 2019 <br />Casco Point Circle Conducted a listening session in 2023(?). <br />Only operational requests. <br />East Long Lake Trail Constructed this nature trail in 2020 <br />French Creek Preserve Establish a Master Plan <br />Golf Course (Winter)In 2022, developed an approach for <br />establishing and maintaining XC ski trails. <br />(It has not snowed since!) <br />- Implement XC ski trails <br />- Purchase equipment Build year-round gas fire pit <br />Highwood Park <br />Livingston Park Established in 2015(?) <br />Lowry Woods Access is very limited, preventing the <br />community from enjoying Explore options for a connection to the Luce Line Establish permanent access to park <br />Lurton Constructed the park in 2016. Expanded <br />the parking lot in 2024. <br />Saga Hill Restored this nature area in 2017 <br />Seven Nations <br />Page 1 of 2 17