My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5204
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 5200 - 5299 (June 28, 2004 - April 11, 2005)
>
Resolution 5204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 1:53:31 PM
Creation date
11/9/2015 1:53:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� °� <br /> 0 0 <br /> � '� a CITY of ORONO <br /> ,� ,:. ; � <br /> ti <br /> ti <br /> RESOLUTION OF THE CITY COUNCIL <br /> ��� ��G rvo. 5 � 0 � <br /> kESI;� . Lot 1: The required side setback to Lot 2 s a e c ange to 30'. The rear <br /> setback may remain as 50' to the west lot line, i.e. the rear setback <br /> line is coincident with the Conservation Easement boundary. <br /> Lot 2: The required side setback to Lots 1 and 3 shall be changed to 30'. <br /> � The rear(west)setback may remain as 50'to the west lot line, i.e. the <br /> rear setback line is coincident with the westerly Conservation Easement <br /> boundary. The location of the required 75' setback from the bank of <br /> the creek shall be shown. The bank of the creek shall be established <br /> � as the 936.5' contour liile for administrative purposes. <br /> Lot 3: The required side setback to Lots 2 and 4 shall be changed to 30'. <br /> - � The existing house setback to Lot 3's northeasterly boundary shall <br /> be recognized as a legal nonconfornuty. The rear(south) setback shall <br /> be shown as 50' from the southerly and southeasterly lot lines. The <br /> � location of the required 75' setbacic from the bank of the creek shall <br /> also be depicted. The bank of the creek shall be established as the <br /> 936.5' contour line for administrative purposes. <br /> � . Lot 4: The required side setback to Lots 3 and 5 shall be changed to 30'. <br /> The rear (southeasterly) setback shall be shown as 50' from the <br /> southeasterly lot line. <br /> Lot 5: The required side setbacic to Lots 4 and 6 shall be changed to 30'. <br /> The rear(easterly)setback shall be shown as 50' from the easterly lot <br /> line. <br /> Lot 6: The required side setback to Lots 5 and 7 shall be changed to 30'. <br /> The rear(easterly)setback shall be shown as 50'from the easterly lot <br /> line. <br /> � Lot 7: The required side setback to Lot 6 shall be changed to 30'. The rear <br /> (easterly)setback shall be shown as 50'from the easterly lot line.The <br /> northwesterly setback shall remain as 30', coincident with the 30' <br /> proposed drainage and utility easement. <br /> � Page 5 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.