My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2025 - Agenda Packet CC - regular meeting
Orono
>
City Council
>
2025
>
04-28-2025 - Agenda Packet CC - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:46 AM
Creation date
4/28/2025 8:42:22 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
4/28/2025
Retention Effective Date
4/28/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. 7579 <br /> <br /> <br />7 <br /> <br />3. A Utility and Access Easement shall be granted to the City over the common element <br />space which align with the drive aisles on the Property. <br /> <br />C8. Development Fees: <br />a. Stormwater and Drainage Trunk Fee: The property will be subject to the 2025 <br />Stormwater and Drainage Trunk Fee of $9,690.00 per acre. The 4.89 acres property is <br />proposed to be developed, therefore $9,690.00 x 4.89 = $47,384.10. <br />b. Water and Sewer Connection Permits: Connection permits will be required for each <br />individual unit (85 units proposed) and will follow the applicable fee schedule. The <br />individual permits and fees will be due when the connection is being installed to each <br />unit with the building permit. <br />c. Met Council Sewer Availability Charge: Due to the size of the buildings and the <br />number/type of proposed connections it is estimated that the development will require 14 <br />SAC units in total according to the Met Council determination letter. Below is the break <br />down for SAC units for each building. The SAC fee will be collected with each building <br />permit. <br />i) Building 1:1 SAC Unit <br />ii) Building 2: 3 SAC Units <br />iii) Building 3: 4 SAC Units <br />iv) Building 4: 4 SAC Units <br />v) Building 5: 2 SAC Units <br />The current fee is $2,485.00 per SAC unit which would result in a total of (14 x <br />$2,485) $34,790.00 required to connect in 2025. <br />d. Water and Sewer Area Connections: The city determined that the units identified by <br />the Met Council should be used to apply the water and sewer area connection charges. <br />The City of Orono does not have a unit breakdown for industrial uses and the regional <br />authority made a determination of use as it compares to single family homes. Following <br />their logic, it is appropriate to apply the same SAC unit determination when applying the <br />water and sewer area connection fees. These fees will be collected with each building <br />permit. The following fees are proposed to be required using the 2025 fee schedule for <br />$4,370.00 water unit and $6,000.00 per sewer unit. (Total $10,370.00 per unit) <br />i) Building 1:1 SAC Unit = $10,370.00 <br />ii) Building 2: 3 SAC Units = $ 31,110.00 <br />iii) Building 3: 4 SAC Units = $ 41,480.00 <br />iv) Building 4: 4 SAC Units = $ 41,480.00 <br />v) Building 5: 2 SAC Units = $ 20,740.00 <br />In total all 5 buildings will result in 14 SAC units and would require (14 x <br />$10,370.00) $145,180.00 in fees for water and sewer area connection fees. <br /> <br />70
The URL can be used to link to this page
Your browser does not support the video tag.