My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-21-2025 - Agenda Packet Planning Commission - Packet
Orono
>
Planning Commission
>
2025
>
04-21-2025 - Agenda Packet Planning Commission - Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
4/22/2025 12:46:38 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
Packet
Document Date
4/21/2025
Retention Effective Date
4/23/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater Narrative/Summary March 11, 2025 <br />Woodhill CC – Course Renovation Project <br />Wayzata, MN <br />3 | P a g e <br /> <br />connections are maintained, with the large east pond complex (pond P12) continuing to route through <br />Wetland P2 before continuing into the south wetland complex (pond P10). <br />Ponds P14 and P15 currently do not have functioning outlets and are required to be pumped by golf course <br />staff to lower water levels. P14 and P15 (WCA No-Loss) are proposed to be drained, filled with onsite soils <br />and replaced with area drains and pipe that will connect into the trunkline storm sewer network. An outlet <br />control structure with compound functioning weir is proposed to be installed to mitigate the loss of storage <br />from P14 and P15. Reference Appendix F - Inundation and Rate Tables the proposed bounce and <br />inundation for Wetland P2. We will be requesting a No-Loss Application to justify that the proposed work <br />is within incidental wetlands and does not impact non-incidental wetlands. Pond P7/9 is proposed to be <br />excavated and expanded from the existing condition to provide additional storage. An outlet control <br />structure is also proposed to replace the existing 12” PVC outlet culvert that feeds into the pumphouse. <br />The proposed drainage pattern can be seen in Appendix D - Proposed Drainage Map and the proposed <br />HydroCAD report can be seen in Appendix E - Proposed HydroCAD Report. <br />Stormwater Management <br />The project proposes to reconstruct 0.55 acres of impervious surface (cart path) and remove 0.26 acres <br />of impervious surface (cart path). As the project will result in less than 1.0 acre of reconstructed <br />impervious, the Stormwater Management Rule does not apply. Please see Appendix F Inundation and <br />Rate Tables for the inundation and bounce for Wetland P2 and the existing and proposed rates leaving <br />the site. <br />Waterbody Crossing and Structures <br />The project proposes replacing the existing inlet and outlet pipe for Wetland P2 and the existing outlet <br />pipe to Wetland P10. Since these pipes exist today and are simply being replaced at the same elevation, <br />the Waterbody Crossing and Structures rule will not be triggered. <br />Summary <br />The proposed project meets MCWD/Orono & Wayzata requirements for grading and erosion control, <br />stormwater management, as well as the waterbody crossing and structures. <br /> <br />141
The URL can be used to link to this page
Your browser does not support the video tag.