Laserfiche WebLink
L601 <br />EROSION CONTROL AND TREE <br />PROTECTION DETAILS <br />N/A <br />creation date:11/14/2024filepath:/Users/ajevert/TVLS Dropbox/PROJECTS (DROPBOX)/WALD RESIDENCE/2. DWG/1. DRAWINGS/PERMIT-SET/FLOODPLAIN PERMIT SET/L607.dwglast saved:ajevert February 13, 2025 10:58 AMThe designs shown and described herein including all technical <br />drawings, graphics and specifications thereof, are proprietary and <br />cannot be copied, duplicated or commercially exploited, in whole or <br />in part, without the express written permission of Travis Van Liere <br />Studio, LLC. These are available for limited review and evaluation <br />by clients, consultants, contractors, governement agencies, and <br />vendors only in accordance with this notice. <br />© Copyright 2025 Travis Van Liere Studio, LLC. All rights reserved. <br />license no: <br />I hereby certify that this plan, specification, or report was prepared <br />by me or under my direct supervision and that I am a duly Licensed <br />Landscape Architect under the laws of the State of Minnesota. <br />43728 <br />T R A V I S V A N L I E R E <br />1 2 0 5 T O N K A W A R O A D , O R O N O , M I N N E S O T A 5 5 3 5 6 <br />W A L D / E L E Y R E T R E A T <br />date:11/14/2024 <br />Rev #Issue/Revision Date <br />PRELIMINARY PRICING SET 08/01/2024 <br />ISSUED FOR PERMIT 08/14/2024 <br />1 WATERSHED PERMIT REVISIONS 09/18/2024 <br />2 WATERSHED PERMIT REVISIONS 10/01/2024 <br />3 CITY DEMO REVISIONS 10/04/2024 <br />4 CITY PERMIT UPDATES 11/18/2024 <br />ISSUED FOR BID 01/29/2025 <br />ISSUED FOR FLOOD ALT. PERMIT 2/13/2025 <br />3255 GARFIELD AVE. S. #100 <br />MINNEAPOLIS, MN 55408 <br />T 612 345 4275 <br />Drawn By: <br />Date: <br />Scale: <br />Drawing: <br />2/13/2025 <br />A.E. <br />Sheet: <br />ROOT ZONE <br />ROOT PRUNING <br />LIMITS <br />PRUNING CUT, TYP., <br />PER ARBORIST <br />RECOMMENDATIONS <br />BASE OF TREE <br />GROUND PLANE <br />PLAN VIEW <br />MAXIMUM 25" ON ONE SIDE OR 33% OF <br />TOTAL ROOT SYSTEM <br />NO MORE THAN HALF <br />THE CROWN OF THE TREE <br />AT END OF SLOPE SECURE BLANKET <br />MATERIAL BY INSERTINGSTAPLES ABOUT <br />20" APART THROUGH THE FABRIC <br />EXTEND MATERIAL ABOUT <br />40" ON TOP OF THE <br />GROUND AND RANDOMLY <br />INSERT STAPLES <br />THROUGH THE MATERIAL <br />ABOUT 20" APART <br />NOTES: <br />1.EROSION CONTROL BLANKET TO BE CATEGORY 4-COCONUT 2S FOR SLOPES GREATER THAN 5:1 AND SIDES AND <br />BOTTOM OF ALL DRAINAGE SWALES AND PONDING AREAS AND CATEGORY 2-STRAW 2S FOR ALL SLOPES LESS <br />THAN 5:1 PER MNDOT SPEC. SECTION 3885. <br />2.INSTALL PER MNDOT SPEC. SECTION 2575 <br />LONGITUDINAL SEAMS: <br />BLANKET MATERIAL MUST OVERLAP <br />AT LEAST 6" AND STAPLES INSERTED <br />THROUGH BOTH FABRICS AT A <br />MAXIMUM SPACING OF 40" APART <br />TRANSVERSE SEAMS: <br />BLANKET MATERIAL MUST <br />OVERLAP AT LEAST 6" AND <br />STAPLES INSERTED THROUGH <br />BOTH FABRICS AT A MAXIMUM <br />SPACING OF 20" APART <br />STAPLES AT 3' O.C. <br />STAPLES MUST BE <br />INSERTED THROUGH <br />OVERLAP MATERIAL SLOPE LENGTH <br /> LESS <br /> THAN <br /> 50 <br />' <br />1.BEFORE INSTALLATION APPLY TOPSOIL, FERTILIZER AND SEED TO SURFACE. <br />2.BEGIN AT THE TOP OF THE CHANNEL, INSTALL MATS BY ANCHORING IN A 6" DEEP BY 6" WIDE TRENCH WITH <br />APPROXIMATELY 12" OF MAT EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR WITH A <br />ROW OF STAPLES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE <br />TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF MAT BACK <br />OVER SEED AND SOIL. SECURE MATS WITH A WITH A ROW OF STAPLES SPACED APPROXIMATELY 12" APART <br />ACROSS THE WIDTH OF THE MATS. <br />3.ROLL CENTER MATS IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. <br />4.PLACE CONSECUTIVE AND ADJACENT MATS END OVER END (SHINGLE STYLE) WITH A MINIMUM 6" OVERLAP. USE <br />A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE OVERLAPPED MATS. <br />5.FULL LENGTH EDGE OF MATS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES <br />APPROXIMATELY 12" APART IN A 6" DEEP BY 6" WIDE TRENCH. <br />6.THE TERMINAL END OF MATS MUST BE ANCHORED WITH A ROW OF STAPLES APPROXIMATELY 12" APART IN A 6" <br />DEEP BY 6" WIDE TRENCH. <br />7.BACKFILL AND SEED AFTER STAPLING. <br />8.FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR PROPER INSTALLATION. <br />FABRIC ANCHORAGE <br />TRENCH BACKFILL <br />WITH TAMPED <br />NATURAL SOIL <br />WIRE MESH REINFORCEMENT, <br />ATTACH FABRIC TO WIRE MESH <br />WITH HOG RINGS, PER MNDOT SPEC. <br />SECTION 3886 B1. <br />SILT FENCE <br />FABRIC <br />DIRECTION OF <br />RUNOFF FLOW <br />METAL (OR WOOD) <br />POST OR STAKE <br />NATURAL SOIL <br />1.SILT FENCES SHOULD <br />BE INSTALLED ON THE <br />CONTOUR (AS OPPOSED <br />TO UP AND DOWN A <br />HILL) AND <br />CONSTRUCTED SO THAT <br />FLOW CANNOT BYPASS <br />THE ENDS. <br />2.ENSURE THAT THE <br />DRAINAGE AREA IS NO <br />GREATER THAN 1/4 <br />ACRE PER 100 FT OF <br />FENCE. <br />3.MAKE THE FENCE <br />STABLE FOR THE <br />10-YEAR PEAK STORM <br />RUNOFF. <br />4.WHERE ALL RUNOFF IS <br />TO BE STORED BEHIND <br />THE SILT FENCE, <br />ENSURE THAT THE <br />MAXIMUM SLOPE <br />LENGTH BEHIND THE <br />FENCE DOES NOT <br />EXCEED THE <br />SPECIFICATIONS <br />SHOWN IN TABLENOTE: SILT FENCE SHALL FOLLOW <br /> MNDOT SPEC. SECTION 3886. <br />DESIGN <br />RECOMMENDATIONS <br />FIGURE 1: TYPICAL INSTALLATION FOR SILT FENCE <br />6" <br />MIN 6"MINPLAN VIEW <br />NOTES: <br />1.ALL TREE PROTECTION FENCING AND EROSION CONTROL FENCING SHALL BE INSTALLED ACCORDING TO THE PLANS PRIOR TO ANY DEMOLITION. AFTER <br />DEMOLITION OR AS NECESSARY, TREE PROTECTION FENCING MAY BE RELOCATED WITH APPROVAL FROM THE LANDSCAPE ARCHITECT. ALL TREE <br />PROTECTION FENCING AND EROSION CONTROL DEVICES SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION PERIOD. <br />2.TREE PROTECTION FENCING SHALL CONSIST OF TEMPORARY METAL WIRE CHAIN LINK MESH FENCING OR APPROVED EQUAL. <br />3.CONTRACTOR SHALL NOT STORE ANY MATERIALS OR PARK ANY VEHICLES IN TREE PROTECTION ZONES. THE FENCE SHALL PREVENT TRAFFIC <br />MOVEMENT AND THE PLACEMENT OF TEMPORARY FACILITIES, EQUIPMENT, STOCKPILES AND SUPPLIES FROM HARMING VEGETATION WITHIN THE <br />LIMITS OF PROTECTION. <br />4.THE CONTRACTOR SHALL CLEANLY CUT ALL ROOTS EXPOSED BY GRADING AS DIRECTED BY THE LANDSCAPE ARCHITECT. <br />5.THE CONTRACTOR SHALL USE DESIGNATED CONSTRUCTION ENTRANCES AND STAGING AREAS. <br />6' MAX <br />6' MAX. <br />POST SPACING 3' MINIMUM 6' IDEAL <br />FROM DRIPLINE <br />DRIPLINE <br />2/3 OFLOGDRIPLINE <br />INSTALL SHREDDED HARDWOOD MULCH <br />(MNDOT TYPE 6). EQUIVALENT MATERIAL <br />MAY BE SUBSTITUTED AT THE DISCRETION <br />OF THE ENGINEER. <br />STAKE DRIVEN THROUGH LOG MESH <br />COIR LOG 6"-7" MINIMUM DIAMETER <br />SOIL <br />WEDGE OR 2"X2" STAKE <br />PRE-DRILLED HOLES <br />0.5"X0.5" OPENING IN NET <br />1/3 OFLOG10' MIN LENGTH <br />2" WASHED COURSE AGGREGATE, <br />12" THICK, OVER GEOFABRIC <br />50' <br /> <br />M <br />I <br />N <br />20' MI <br />N <br />EDGE <br />O <br />F <br />P <br />U <br />B <br />LI <br />C <br />R <br />O <br />A <br />D <br />O <br />R <br />P <br />A <br />V <br />E <br />M <br />E <br />N <br />T <br />TABLE 1: MAXIMUM SLOPE LENGTH AND SLOPE FOR WHICH SILT FENCE IS APPLICABLE <br />BY CALCULATION BY CALCULATION BY ACCEPTED DESIGN <br />PRACTICES <br />SLOPE (H:V)%SILT FENCE STORAGE EQUALS <br />2 FT FOR A 100-YEAR EVENT <br />SILT FENCE STORAGE EQUALS 2 FT <br />FOR A 2-YEAR EVENT OR 3 FT FOR A <br />100-YEAR EVENT <br />MAXIMUM SLOPE <br />LENGTH <br />100:1 1%400 FT 900 FT 100 FT <br />50:1 2%200 FT 450 FT 75 FT <br />25:1 4%100 FT 225 FT 75 FT <br />20:1 5%80 FT 180 FT 75-50 <br />17:1 6%67 FT 150 FT 50 FT <br />12.5:1 8%50 FT 112 FT 50 FT <br />10:1 10%40 FT 90 FT 50-25 FT <br />5:1 20%20 FT 45 FT 25-15 FT <br />4:1 25%16 FT 36 FT 15 FT <br />3:1 33%12 FT 27 FT 15 FT <br />2:1 50%8 FT 18 FT 15 FT <br />SCALE:N/A <br />TREE PROTECTION FENCING INSTALLATION5 SCALE:N/A <br />BIOLOG INSTALLATION6 SCALE:N/A <br />ROOT PRUNING DETAIL7 <br />SCALE:N/A <br />EROSION CONTROL MAT INSTALLATION3 <br />SCALE:N/A <br />GRAVEL CONSTRUCTION ENTRANCE DETAIL4 <br />GENERAL EROSION AND SEDIMENT CONTROL NOTES: <br />1.SEE THE EROSION AND SEDIMENT CONTROL PLAN (L011) (WHEN UNDER ONE (1) ACRE DISTURBED) SHEETS FOR BMP <br />CONSTRUCTION LAYOUT(S), DETAILS, AND ADDITIONAL NOTES. <br />2.THE CONTRACTOR SHALL INSTALL PERIMETER EROSION CONTROL AT THE LOCATIONS SHOWN ON THE PLANS PRIOR TO <br />COMMENCEMENT OF ANY LAND DISTURBANCE AND/OR CONSTRUCTIONACTIVITIES. SILT FENCE AND/OR BIOROLLS <br />SHALL FOLLOW EXISTING CONTOURS AS CLOSELY AS FEASIBLE. <br />3.BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL INSTALL A TEMPORARY CONSTRUCTION EXIT AT EACH <br />POINT WHERE VEHICLES WILL EXIT THE CONSTRUCTION SITE. <br />3.1. FOR ROCK CONSTRUCTION EXITS, USE TWO (2") INCH OR GREATER DIAMETER ROCK IN A LAYER AT LEAST SIX (6") <br />INCHES THICK ACROSS THE ENTIRE WIDTH OF THE CONSTRUCTION EXIT. EXTEND THE CONSTRUCTION EXIT AT LEAST <br />50 FEET INTO THE CONSTRUCTION ZONE USING A GEO-TEXTILE FABRIC BENEATH THE AGGREGATE TO PREVENT <br />MIGRATION OF SOIL INTO THE ROCK FROM BELOW. SEE SEDIMENT AND EROSION CONTROL PLAN SHEETS FOR BMP <br />CONSTRUCTION DETAILS AND NOTES. <br />4.THE [GENERAL] CONTRACTOR SHALL DENOTE ON THE PLANS THE TEMPORARY PARKING AND STORAGE AREAS, WHICH <br />SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREAS, EMPLOYEE PARKING AREA(S), AND <br />AREAS FOR LOCATION OF PORTABLE FACILITIES, OFFICE TRAILERS, TOILET FACILITIES, ETC. <br />5.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND <br />PRIVATE PAVEMENT AREAS. REMOVAL SHALL AT LEAST BE ON A DAILY BASIS WHEN TRACKING OCCURS AND/OR WHEN <br />NEEDED. SWEEPING SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE CONSTRUCTION AND DONE IN A <br />MANNER TO PREVENT DUST BEING BLOWN TOWARD ADJACENT PROPERTIES AND/OR PUBLIC RIGHT-OF-WAY (ROW). <br />6.THE CONTRACTOR SHALL INSTALL INLET PROTECTION AT ALL PUBLIC AND PRIVATE CATCH BASIN INLETS, WHICH <br />RECEIVE RUNOFF FROM ANY OF THE DISTURBED AREAS. THE CONTRACTOR SHALL CLEAN, REMOVE SEDIMENT, AND/OR <br />REPLACE STORM DRAIN INLET PROTECTION DEVICES ON A ROUTINE BASIS SUCH THAT THE DEVICES ARE FULLY <br />FUNCTIONAL FOR THE NEXT RAIN EVENT. <br />6.1.SEDIMENT DEPOSITED IN AND/OR PLUGGING THE DRAINAGE SYSTEM(S) SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR AND LEGALLY DISPOSED. <br />6.2.HAY BALES OR FILTER FABRIC WRAPPED GRATES ARE NOT ALLOWED FOR INLET PROTECTION. <br />6.3.SILT FENCE OR FABRIC PLACED UNDER THE GRATE IS NOT AN APPROVED FORM OF INLET PROTECTION. <br />7.THE CONTRACTOR SHALL LOCATE SOIL OR DIRT STOCKPILES NO LESS THAN 25 FEET FROM ANY PUBLIC OR PRIVATE <br />ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN 48 HOURS, STABILIZE THE STOCKPILES BY <br />MULCHING, VEGETATIVE COVER, TARPS, AND/OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING <br />SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN <br />TWO (2') FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. <br />8.THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE <br />CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED AND ACCEPTED. INSPECT TEMPORARY EROSION AND SEDIMENT <br />CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES <br />IMMEDIATELY. <br />9.THE CONTRACTOR SHALL TEMPORARILY AND/OR PERMANENTLY STABILIZE ALL CONSTRUCTION AREAS WHICH HAVE <br />UNDERGONE FINAL GRADING, AND ALL AREAS IN WHICH GRADING AND/OR SITE BUILDING CONSTRUCTION OPERATIONS <br />ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND, AND/OR RUNNING WATER WITHIN SEVEN (7) <br />DAYS. <br />9.1.APPROPRIATE MnDOT SEEDING MIXTURES SHALL BE UTILIZED, UNLESS OTHERWISE NOTED. <br />9.2.USE SEED AND MULCH, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS. <br />9.3.ANY USE OF EROSION CONTROL BLANKET MUST BE FULLY BIODEGRADABLE WITH LOOSE-WEAVE NETTING (OR <br />NETLESS). <br />9.4.REMOVE ALL TEMPORARY SYNTHETIC, STRUCTURAL, NON-BIODEGRADABLE EROSION AND SEDIMENT CONTROL <br />DEVICES AFTER THE SITE HAS UNDERGONE FINAL STABILIZATION WITH PERMANENT VEGETATION ESTABLISHMENT. <br />9.5.FINAL STABILIZATION FOR PURPOSES OF THIS REMOVAL IS AT LEAST 75 PERCENT ESTABLISHED COVER OVER ALL <br />DENUDED, DISTURBED, ETC. AREAS. <br />10.ALL EXPOSED SOIL AREAS SHALL BE STABILIZED PRIOR TO THE ONSET OF WINTER CONDITIONS. ANY WORK STILL BEING <br />PERFORMED WILL BE SNOW MULCHED AND/OR SNOW BLANKETED WITH SNOW SEEDING. <br />10.1.APPROPRIATE MnDOT SEEDING MIXTURES SHALL BE UTILIZED, UNLESS OTHERWISE NOTED. <br />11.READY MIXED CONCRETE AND CONCRETE BATCH/MIX PLANTS ARE PROHIBITED WITHIN THE PUBLIC RIGHT-OF-WAY <br />(ROW). ALL CONCRETE RELATED PRODUCTION, CLEANING, AND MIXING ACTIVITIES SHALL BE DONE IN THE DESIGNATED <br />CONCRETE MIXING/WASHOUT LOCATIONS AS DETERMINED BY THE [GENERAL] CONTRACTOR. <br />11.1.UNDER NO CIRCUMSTANCES MAY WASHOUT WATER DRAIN INTO THE PUBLIC RIGHT-OF-WAY (ROW) AND/OR INTO <br />ANY PUBLIC AND/OR PRIVATE STORM DRAIN CONVEYANCE. <br />12.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES TO PREVENT EROSION. <br />13.CHANGES TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN (WHEN UNDER ONE (1) ACRE DISTURBED) OR <br />THE STORMWATER POLLUTION PREVENTION PLANS (SWPPP) SHEETS MUST BE APPROVED, IN WRITING, BY THE EROSION <br />CONTROL INSPECTOR PRIOR TO IMPLEMENTATION. <br />13.1.THE CONTRACTOR SHALL PROVIDE INSTALLATION INSTRUCTIONS, DETAILS, ETC. FOR ALL PROPOSED ALTERNATE <br />TYPE DEVICES. <br />14.ALL CONSTRUCTION AREAS SHALL BE PROTECTED AT THE END OF EACH WORKING DAY, THIS INCLUDES, BUT NOT <br />LIMITED TO: BACKFILLING OF AND/OR PROTECTING TRENCHES FOR UTILITY CONSTRUCTION; PLACEMENT OF GRAVEL <br />OR BITUMINOUS PAVING FOR ROADWAY REPLACEMENT; CLOSING AND LOCKING GATES AND/OR OPENINGS IN <br />TEMPORARY FENCING. <br />15.ADJACENT STREETS, SIDEWALKS/TRAILS, AND/OR ALLEYS MUST BE SWEPT TO KEEP THEM FREE OF SEDIMENT, DEBRIS, <br />ETC. <br />16.CONTRACTOR MUST MONITOR CONDITIONS AND SWEEP AS NEEDED OR WITHIN 24 HOURS OF NOTICE BY THE <br />CITY/COUNTY, THE ENGINEER, OR THE OWNER. <br />SCALE:N/A <br />SILT FENCE INSTALLATION1 SCALE:N/A <br />EROSION CONTROL BLANKET INSTALLATION2 <br />117