Laserfiche WebLink
City of Orono <br />• Fee Schedule - Page 2 <br />(Effective April 22, 1975) <br />Note: When construction valuation exceeds $1,000.00 and plan is <br />required: <br />Residential Plan Check 50% of Bldg. Permit Fee <br />Comm. & Ind. Plan Check 65% of Bldg. Permit Fee <br />(expires 180 days after application) <br />Reinspection $10.00 <br />Zoning - Land Use <br />Rezoning Application $100.00* 32.600 <br />Subdivision 100.00 39.350 <br />and each lot 2.00 39.350 <br />and public open space or cash 39.350 <br />New, Special or Conditional Use <br />Principal $50.00* 32.600 <br />Accessory $30.00* 32.600 <br />Simple Subdivision $30.00* 32.600 <br />Appeal from Zoning Adm. Div. $10.00 32.120 <br />Variance. $30.00* 32.600 <br />• Street Vacation $25.00.- <br />plus: <br />25.00plus: fixed and additional costs - 32.651 and 32.652) <br />