My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-1989 Council Packet
Orono
>
City Council
>
1989
>
06-12-1989 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 12:56:58 PM
Creation date
4/21/2025 12:51:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #1408 <br />May 12, 1989 <br />Page 3 of 4 <br />List of Exhibits <br />Exhibit A - <br />Exhibit B - <br />Exhibit C - <br />Exhibit D - <br />Exhibit E - <br />Exhibit P - <br />Exhibit G - <br />Exhibit H - <br />Exhibit I - <br />Exhibit J-1 <br />Exhibit J-2 <br />Exhibit K - <br />Exhibit L - <br />Exhibit M - <br />Exhibit N - <br />Exhibit 0 - <br />Exhibit P - <br />Application <br />Property Owners List <br />Resolution #2194 <br />Resolution #2306 <br />• M.C.W.D. Permit - 87-78 <br />Previous Elevation of Clubhouse <br />Typical Section - Water Quality Filter <br />Sea Wall - Typical Section <br />Engineering Design/Standards for Treatment <br />Facility <br />- Cook's Report of 5/14/87 <br />- Cook's Original Sketch for Treatment of Run-off <br />Site Plan - Total Marina <br />Detailed Site Plan of Land Use Area <br />Newspaper Article <br />L.M.C.D. Letter <br />Current/Revised Floor Plan <br />Elevations <br />Status of Application - <br />On November 23, 1987, the Council approved a sea wall in <br />place of rip-rapping as originally proposed by the applicant. At <br />the time of the construction of the sea wall, the water quality <br />treatment facility was installed as directed by the City in the <br />original variance review for the total improvement of the marina <br />(review Exhibits G, H, and I). The area behind the sea wall has <br />been lined with a filter fabric and backfilled with crushed <br />limestone. Weep poles have been placed 18" apart in the sea wall <br />to accommodate drainage through the filter area. The M.C.W.D. <br />conditioned approval on the rock backfilled to be of limestone, <br />as they feel limestone has the capacity to absorb petrolium <br />products. Glenn Cook has reviewed the information submitted for <br />the current review and finds it to be completely acceptable. In <br />fact, he comments that it is far better than the one he <br />originally recommended (review Exhibits J-1 and J-2). <br />The applicant has completely reconstructed the docks, <br />obtaining the appropriate building permit with penalty fee. One <br />structure remains serving as the current business office. The <br />structure will remain until the clubhouse has been installed. <br />The Certificate of Occupancy will not be issued until the <br />structure is removed. <br />As noted above, the new clubhouse will be only 16' high <br />measured to the peak of the clerestory. The 40'x30' footprint <br />has been maintained requiring the same setback approvals as in <br />the original variance application review.
The URL can be used to link to this page
Your browser does not support the video tag.