Laserfiche WebLink
v � <br />CITY OF ORONO SEP'T'IC SYSTEM PERMIT APPLICATION <br />Box 66 (2750 Kelley Parkway) <br />Crystal Bay, MN 55323 <br />JOB SITE ADDRESS: 7 3 <br />Occupancy Type: Residential Commercial Other <br />Permit Type: <br />tepair <br />or Replacement System, $100.00 <br />Existing System, $ 50.00 <br />(Tanks or Drainfield) <br />0.50 State surcharge added to above fees <br />*See fee schedule for non-residential permit fees <br />Owner's Name: J � cC e -,k PhoneNumber. SS D - <br />Mailing Address: ICity: Ti:_ <br />Contractor's Name: v .��^c PhoneNumber:_ -7 - 3-7/-f <br />�l <br />Mailing Address: 31 City:_ Tom: Ss� 74 <br />DO NOT MAIL PAYMENT WITH THIS APPLICATION <br />GENERAL INSTRUCTIONS <br />1. Applications for septic system permits may be mailed or submitted in person at the City <br />Offices; however, permits will not be mailed out. The permit must be picked up in <br />person at the City Offices and work must not begin unless the permit card is on the job <br />site. <br />2. Permits will be issued only to contractors holding a City of Orono Septic System <br />Installers License. <br />3. All work must be done in accordance with the approved septic system design. Design <br />reports are not considered approved unless accompanied by the "City of Orono Septic <br />System Approval" cover sheet signed by the City Inspector. <br />4. The following inspections will be required for all septic systems: <br />A. Pre -installation site inspection to include inspector, installer, and general contractor. <br />B. Tank installation prior to covering. <br />C. Drainfield trench installation prior to covering. For mounds, Inspection is required <br />after rough -up but prig to sand placement (sand will be jar tested for silt content), <br />and again during pressure distribution piping installation in the rock bed. <br />D. Final inspection to verify proper final cover depths and to verify that all pump station <br />(where required) components are functional and comply with codes. <br />5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br />hour notice is required for all inspections. <br />