My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-18 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive West
>
2735 Countryside Drive West - 04-117-23-12-0018
>
Septic
>
1993-12-18 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 1:51:32 PM
Creation date
4/16/2025 1:42:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2735
Street Name
Countryside
Street Type
Drive
Street Direction
West
Address
2735 Countryside Drive West
PIN
0411723120018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. D(.,'.'%...,-1. 1. L:IKL 1'►'iLT11 <br />1. If landslope is 2.9 percent or less, basal width includes both the <br />upslope and downslope dike widths, <br />2. <br />Calculate minimum mound size based on geometery: <br />a. Determine depth of clean sand fill at upslope edge of rock <br />layer: Separation z , o feet <br />b. Multiply rock layer width by landslope to determine drop <br />in elevation; Slope Difference <br />/ x _Z%+100=, -L- feet <br />c. Add depth of clean sand depth of clean sand for <br />separation at upslope edge (2a) to depth of rock layer to <br />rock depth and the depth of cover to find the total mound <br />height at upslope edge of rock layer; <br />x.o ft + 1 ft + 1 ft = 1-i.0 feet <br />d. Enter table on page bottom with landslope and upslope <br />dike ratio. Select dike multiplier of 3 .'7 <br />e. Multiply dike multiplier by upslope mound height <br />to get upslope dike width: 4.L) x 3.9 = i_ feet <br />f. Add the depth of slope difference (2b) to the upslope <br />height to get the downslope height H . _, + . i = Li . z feet <br />g. Enter table on page E-18 with landslope and downslope <br />dike ratio. Select dike multiplier of !4 •3 5r <br />h. Multiply dike multiplier by downslope mound height <br />to get downslope dike width: 4. t x Lt -s 5r = i / feet <br />i. Mininmum mound width is the sum of upslope dike <br />width plus rock layer width plus downslope dike width; <br />_L�' f.'+ )0 41 feet <br />j. Subtract the Minimum width G.i from the Absorption <br />width F.4 to find the Additional Downslope required for <br />Absorption <br />an ft - Lr� ft = -i L feet "'" <br />k. Add the Additional Downslope required for Absorptio. <br />to the downslope dike width and recalulate the Total <br />Mound Width which. is is the sum of upslope dike <br />width plus rock layer width plus '-,wnslope dike width <br />ft+lift+/ cd it = lam- -,feet <br />1. Total mound length is the sum of upslope dike width <br />plus rock layer leng-h plus upslope dike width; <br />ft +. ft + ft = 'Pid feet <br />/04 <br />I be CAM <br />14..t.d <br />L2 im S.p..."- <br />9" 4N Wd16 <br />Ib.rr61�. YM4O <br />TOW Length -� V <br />/oy <br />kt <br />l'1 <br />Wns opepS <br />5:1 <br />al <br />7:1 <br />3:1 <br />4:1 <br />o}%: <br />S.1 <br />&1 <br />7:1 <br />9:1 <br />s MOPP <br />0 <br />3A <br />l0 <br />S.0 <br />a0 <br />7.0 <br />3.0 <br />4.0 <br />SO <br />60 <br />7.0 <br />6A <br />1 <br />lop <br />4.17 <br />SM <br />6311 <br />7;1 <br />291 <br />475 <br />516 <br />64 <br />7.41 <br />3.19 _ _ <br />COSH <br />10- <br />V'.LLi,-� <br />� <br />i 36 <br />6 14 <br />600 <br />.Y1 <br />{sl <br />3M <br />71_ <br />7,.- <br />3.57 <br />i r. <br />3\ <br />615 <br />4 <br />3.41 <br />416 <br />n ;_i <br />7.6. <br />2 #a <br />3.45 <br />41-1 <br />i 64 <br />5.46 <br />606 <br />S <br />3S3 <br />5.00 <br />a67 <br />6.57 <br />IUir <br />261 <br />3.33 <br />4fo <br />462 <br />5.19 <br />5.71 <br />6 <br />366 <br />5.26 <br />7.14 <br />036 <br />12.07 <br />2.S4 <br />3.23 <br />]6S <br />441 <br />4-93 <br />SAI <br />3110 <br />S 36 <br />7.69 <br />10.34 <br />13.73 <br />246 <br />312 <br />370 <br />4.2) <br />4.70 <br />S.13 <br />1 <br />3.9s <br />S.61 <br />6.33 <br />ItS4 <br />15.91 <br />242 <br />1.10 <br />357 <br />416 <br />449 <br />4M <br />9 <br />4.11 <br />625 <br />9.09 <br />13 fM <br />16 92 <br />236 <br />2.04 <br />3.45 <br />390 <br />4.30 <br />465 <br />10 <br />429 <br />667 <br />I OA <br />15110 <br />2131 <br />231 <br />2 66 <br />3.11 <br />37-1 <br />4 12 <br />444 <br />11 <br />4" <br />7.14 <br />11.11 <br />171; <br />3n 41 <br />226 <br />2.76 <br />1 -1 <br />3.61 <br />3.9S <br />416 <br />12 <br />4b9 <br />TO <br />1230 <br />2143 <br />4175 <br />2.21 <br />270 <br />3.12 <br />3A9 <br />VW <br />4.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.