Laserfiche WebLink
ORONO XUNZCIPAL FACILITIES <br />KAY 17, 1989 <br />BOARMAN6J <br />ASSOCIATES <br />architecture <br />ENGINEERING <br />interior design <br />SITE OPTIONS <br />OPTION 1 OPTION 2 OPTION 3 OPTION 4 <br />SITES A SITE A SITE B SITE C <br />CITY HALL CITY HALL CITY HALL CITY HALL <br />POLICE POLICE POLICE POLICE <br />SITE B SITE C PUBLIC PUBLIC <br />PUBLIC PUBLIC WORKS WORKS <br />WORKS WORKS <br />1. <br />2. <br />LAND COST NONE UNKNOWN NONE UNKNOWN <br />SITE PREPARATION <br />A. Demolition $ 20,000 $20,000 NONE NONE <br />B. Soils Correction NONE NONE $160,000 <br />C. Landscaping/Screening <br />D. Utilities <br />$ 25,000 55,000 $ 20,000 40,000 <br />♦Sewer 12,500 25,500 12,500 12,500 <br />♦Water 279,000 147,500 135,000 12,500 <br />E. Paved Surfaces 95-150 70.250 120.000 90.000 <br />$422,650 $317,750 $287,500 $315,000 <br />NOTE:SITE PREPARATION <br />The major cost Impact for Sites A & B is Utilities. (12” 1000 G.P.M. <br />well with pumps and holding tank § $135,000) The significant cost impact <br />for Site C is soils corrections. <br />3. OTHER CONSIDERATIONS HAVING UNDEFINED COST IMPACTS. <br />A. PHASING COSTS <br />SITE A & B: Construction costs will tend to increase as the <br />City Hall/Police Building and the Public Works <br />Building would not be constructed simultaneously. <br />PHASE I:Construct the Public Works Building on Site B. <br />222 North 2rid Street Mtnne.tpoli'j MinnesotJ 55401 612-339-3752