Laserfiche WebLink
sewer pump for each house. <br />ESTIMATED CONSTRUCTION COST BREAKDOWN <br />By area this breaks down as follows: <br />STUBBS BAY NORTHWEST - This would be both a sewer main <br />and a lateral installation for these severely <br />substandard properties. The per unit costs are as <br />follows: <br />Per Unit # of Units TOTAL <br />Sewer Main Charge $6,500 <br />Service Line Charge 4,240 <br />TOTAL $10,740 <br />19 <br />19 <br />$123,500 <br />80,560 <br />$204,060 <br />The cost of sewering this area is substantially reduced <br />by including the other areas. <br />STUBBS BAY NORTHEAST - This is the second area of <br />existing high density development that has a large <br />number of failed or failing systems. <br />Per Unit # of Units TOTAL <br />Sewer Main Charge - $6,500 <br />Service Line Charge - 7,180 <br />42 <br />42 <br />$13,680 <br />$273,000 <br />301,560 <br />$574,560 <br />BAYSIDE EAST/BEDERWOOD/BAYSIDE NORTH - The Other three <br />areas will have a trunk available to them. Potential <br />solutions for eventual hook up to each of those <br />individual properties in those areas include either: <br />A.) Separate "Service Line Charge" <br />Per Unit <br />Estimated <br />« of Units TOTAL <br />Bayside East <br />Bederwood <br />$9,140 <br />9,700 <br />10 <br />14 <br />$ 91,400 <br />135,800