Laserfiche WebLink
If <br />Q <br />Q <br />Q <br />13 <br />S <br />D <br />0 <br />0 <br />u <br />Q <br />3 <br />3 <br />3 <br />3 <br />3 <br />APPENDIX C <br />WATER MAIN LATERAL <br />COST ESTIMATE <br />CONNECT TO LONG LAKE SYSTEM <br />200 Lin.ft.6" DIP 1 $16.00/lin.ft.$3,200.00 <br />2.400 Lin.ft.8* DIP % $18.00/lin.ft.43.200.00 <br />6 Each 8- GV & box e $500.00/each 3,000.00 <br />10 Each 6* GV & box 1 $400.00/each 4,000.00 <br />8 Each Hydrant 8 $1.000.00/each 8,000.00 <br />5.000 Lbs.Fittings I $1.00/lb.5,000.00 <br />2.600 Lin.ft.Trench coopaction % $1.00/lln.£t.2,600.00 <br />60 Lin.ft.Jack water main 8 $150.00/lln.ft.9,000.00 <br />2 Each Cut Into existing 8" line 8 $1.000.00/each 2,000.00 <br />Subtotal $80,000.00 <br />5Z Contingencies 4.000.00 <br />Total Construction $ 84,000.00 <br />^ 15Z Legal, Engineering. & Admin.12.600.00 <br />$ 96.600.00 <br />■i* SZ Bonding & Capitalized Interest 4.800.00 <br />Total Project Cost $101,400.00 <br />- 16 - <br />013939R