Laserfiche WebLink
u <br />Q <br />0 <br />i <br />Q <br />D <br />2 <br />2 <br />I <br />ij <br />APPENDIX A (CONT’D) <br />SANITARY SEVER LATERAL LINE <br />COST ESTIMATE <br />2,950 Lin.ft.8* PVC, 14'-16' deep 8 $20.00/lin.ft.$59,000.00 <br />14 Each Manholes 8 $l,000.00/ea.14,000.00 <br />80 Lin.ft.MH depth greater than 8' 8 $100.00/Iin.ft.8,000.00 <br />14 Each 8* X 6" .ye branches 8 $50.00/ea.700.00 <br />400 Lin.ft.6" PVC service line 8 $10.00/lin.ft.4,000.00 <br />3,350 Lin.ft.Class B-2 bedding 8 $3.00/lin.ft.10,050.00 <br />3,350 Lin.ft.Trench compaction 8 $2.00/lin.ft.6,700.00 <br />5 Ac.Seeding v/topsnll 8 $4,000.00/ac.20,000.00 <br />100 Sq.yds.Street restoration 8 $25.00/sq.yd.2,500.00 <br />Subtotal $124,950.00 <br />52 Contingencies 6.250.00 <br />Total Construction $131,200.00 <br />4- 152 Legal, Engineering, & Admin.19.700.00 <br />$150,900.00 <br />4- 52 Bonding & Capitalized Interest 7.550.00 <br />Total Project Cost $158,450.00 <br />Sanitary Sever Trunk Cost - $297,100 * 158,450 - $138,650 <br />- 14 - <br />013939R <br />»