My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-11-15 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive
>
2555 Countryside Drive - 04-117-23-14-0006
>
Septic
>
1982-11-15 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 11:46:07 AM
Creation date
4/3/2025 11:37:45 AM
Metadata
Fields
Template:
x Address Old
House Number
2555
Street Name
Countryside
Street Type
Drive
Address
2555 Countryside Drive
PIN
0411723140006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXH,3- <br />TO: Jeanne A. Mabusth, Zoning Administrator <br />FROM: Michael 11. Gaffron, Septic System Inspector <br />DATE: November 6, 1981 <br />SUBJECT: #654 Dicon, Willow Drive South - Subdivision <br />I have reviewed the submitted r(,r,rt for the above referenced <br />proposed subdivision, and _ make the following comments: <br />The report by Borg indicates high -water -table soils throughout <br />the 6 lots tested. <br />Lot 1 - Slopes of 8%, 10i. Percolation rates at a depth of <br />25" - 31" averaged 10 mpi in the primary site and 23 mpi <br />for the alternate site. Both sites are acceptab' for <br />standard mound systems. <br />Lot 2 - Slopes of 4-6s in areas tested. Percolat,,jn rates <br />averaged 25 mpi in the primary site and 13 mpi in the alternate <br />site. Bot'1 sites are acceptable for standard mound systems. <br />Lot 3 - Slopes of 5% - 6% in areas tested. Average percolation <br />rates averaged 27 mpi for the primary site, and 34 mpi in the <br />alternate site. Both sites are acceptable for standard mound systems. <br />Lot 4 - Slopes of 3-4% in areas tested. Percolation rates <br />averaged 41 mpi in primary site and 20 mpi in the alternate <br />site. Both site: are acceptable for standard mound systems. <br />Lot 11 - Slopes of 8-10% in areas tested percolation rates <br />averaged 40 mpi in the primary site and 31 mpi at the alternate <br />site. NOTE: CARE MUST BE TAKEN TO PLACE TETE MOUND ON A <br />SLr,PE OF 6% OR LESS ON THIS LOT. <br />Lot 10 - Slopes average 6%. P( --solation rates averaged 48 mpi <br />on the primary site and 87 mpi on the alternate site. <br />General Comments: Percolation testing was done at a range of <br />depths from 13" to 31". No real correlation appears to exist <br />between depth of testing and percolation rates. The soil <br />borings reflect a seasonably saturated zone beginning at a <br />a range of depths from 1.2 ft to 2.5 ft. Actual current <br />perched water tables were found on some sites at a depth <br />of 3.5 ft. or greater. <br />Based on the above data, the site evaluations recommendation <br />for all mound systems is appropriate. I confirmed the soil <br />boring report wit]-, a boring of my own. <br />
The URL can be used to link to this page
Your browser does not support the video tag.