Laserfiche WebLink
CITY OF ORONO <br />GENERAL CONSTRUCTION REQUIREMENTS <br />MOUND DRAINFIELD SYSTEM <br />TO BE USED WHERE: Seasonal perched water table is between 2 feet and 4 feet <br />below surface. Percolation rate in top 12" of soil is <br />faster than ()o MPI. Percolation rate in subsoil but above <br />water table is faster than 120 MPI. Where percolation rate' <br />is 60-120 MPI, depth to groundwater shall be at least 3' <br />and slope must be no more than 3%. Where percolation rate <br />is 30-60 MPI, depth to groundwater shall be at least 2' <br />and slope must not exceed 6%. If percolation rate is faster <br />than 30 MPI, depth to groundwater shall be at least 3' and <br />slop:. must not exceed 6-12%. <br />CONNECTION TO <br />HOUSE House to tanks may be PVC (ASTM D-3034 or better), <br />cast iron or clay tile. PVC should be sand -bedded <br />in flat runs over long distances. No outside air test <br />required but joints must be tight. <br />TANKS Two (2) precast concrete tanks are required. Mitt. size <br />1000 gal. and 750 gal.; we recommend 2 1000's. Tanks <br />must have 20" manhole riser to within 12" of final <br />grade, and at least one 4"-6" inspection stack to <br />surface. Baffles must be acid resistant and may be <br />plastic, fiberglass, or precast with tank. <br />DRAI14FIELD Mound consisting of 12-24" layer of sand on plowed, chopped, <br />or otherwise scarified natural surface soil. 12" rock bed <br />on top of sand layer, 10' maximum width X length dependent <br />on water use. Distribution pipe is laid in too 3" of rock. <br />Cover rock bed with straw or hay AND building paper. A <br />layer of sandy loam 0-12" thick shou?d be placed over the <br />covered rock bed and a 6" layer of topsoil then placed over <br />the entire mound. Finished sideslopes to be 3:1 or flatter. <br />Grass cover should be established as soon as possible over <br />the mound area to reduce erosion and aid in evaporation. <br />THE MOST IMPORTANT STEP IN CONSTRUCTING A MOUND IS <br />PREPARING THE NATURAL SOII, SURFACE BY DISC -PLOWING <br />OR CHOPPING WITH A BACKHOE TO A DEPTH OF ABOUT 12". <br />When sand is pushed or dropped onto this loosened raw top- <br />soil (DON'T drive on it), an interface is formed which will <br />allow percolation to occur from the sand into the topsoil. <br />SEE SKETCH ON BACK OF THIS SHEET. <br />DISTRIBUTION The mound must use pressure distribution and requires a <br />pump from the septic tanks. Distribution must be 1Y' PVC <br />or plastic with 4" holes (turned down) every 36". Pumping <br />from a 2" manifold, distribution system should be 3 lengths <br />of pipe spaced )�O" on center capped at the ends. running <br />the length of the rock bed (see --ketch). No drop boxes or <br />distribution boxes are used. 4" PIPE WITH GRAVITY DISTRIB- <br />UTION IS NOT ACCEPTABLE IN A MOUND SYSTEM. <br />