My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-09-13 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
C
>
Countryside Drive
>
2475 Countryside Drive - 04-117-23-11-0006
>
Septic
>
1982-09-13 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 12:19:21 PM
Creation date
4/2/2025 12:09:41 PM
Metadata
Fields
Template:
x Address Old
House Number
2475
Street Name
Countryside
Street Type
Drive
Address
2475 Countryside Drive
PIN
0411723110006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: Jeanne A. Mabusth, Zoning Administrator <br />FROM: Michael P. Gaffron, Septic System Inspector <br />DATE: June 14, 1982 <br />SUBJECT: #654 Dicon, 155 Willow Drive South - Additional On -Site <br />Testing <br />I have reviewed the submitted soil and site evaluation for the <br />two lots on the north side of the road in Phase 1. Testing <br />indicates average perc rates varying from 1 to 48 mpi, with <br />high water tables (saturated zones) in all but the most northeasterly <br />site. Mound systems are applicable for all these sites, although <br />the northern site for Lot 1, Block 1, could support a shallow <br />trench system. <br />I note that Lots 2, 3 and 4 in Block 2, have been realigned. <br />By superimposing the previous testing over the new lot lines, it <br />is apparent that 2 of the 6 perc tests originally done on Lot 4 <br />are now on Lot 3. Technically, additional testing should be done <br />within the boundaries of the revised Lot 4. However, since the <br />soils appear to be fairly consistent throughout the division, and <br />since mounds will be used on all the lots, this minor additional <br />testing is not critical and may be waived until a house is proposed <br />for the site. <br />I will reiterate that mounds should be placed on the most level <br />sites within the tested areas; and that prior to road construction, <br />all drainfield sites should be staked off to eliminate traffic <br />or disturbance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.