Laserfiche WebLink
■■■ Primary Frontage Road <br />• ••• Alternate Frontage Road Area 5 <br />Recommended Alternative -Fig. 33 <br />The recommended alternative in Figure "^3 would include <br />transition of commercial on the south side of the frontage road <br />back to mu 11i-residentia 1 on the north, with appropriate <br />buffering from the single family to the north. The frontage <br />road, regardless of configuration, would commence opposite the <br />frontage road west of Willow Drive and tie into the frontage road <br />coming from North Brown Road. Given the intensity of <br />development, this area would be sewered either through the Long <br />along Willow Drive, or possibly through branches of the Long Lake <br />system.